← Back to search

Mishells Bandon Co Cork

INCOMPLETED APPLICATION

Planning application 17/7326

Cork - Cork County Council

Proposed Development

Construction of dwelling and associated site works which includes installation of foul water effluent treatment plant.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Dec 2017

  2. Decision due

    20 Feb 2018

Application Details

Location
Mishells Bandon Co Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
18 December 2017
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
20 February 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/5342REFUSED24 May 2018

Construction of a dwelling and to carry out associated site works, including the installation of foul water effluent treatment plant

Mishells Bandon Co. Cork

0m
19/4288REFUSED11 Feb 2019

Construction of dwelling, and to carry out associated site works which includes installation of foul water effluent treatment plant

Mishells Bandon Co. Cork

123m
22/4890INCOMPLETED APPLICATION20 Apr 2022

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co. Cork

145m
22/5234CONDITIONAL30 May 2022

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co Cork

166m
06/10908CONDITIONAL26 Sept 2006

Demolition of dwelling and outbuilding and construction of dwellinghouse and garage

Mishells Bandon

172m
25/5967Grant with Conditions19 Sept 2025

Permission for change of design of works to existing dwelling to comprise construction of part single storey extension, part two-storey extension and modifications to said dwelling, as granted under permission reg. number 23/06445, and all associated site works.

Mishells, Bandon, Co. Cork, P72C448

172m
23/6445CONDITIONAL8 Dec 2023

Permission for works to existing dwelling to comprise construction of part single storey extension, part two-storey extension, modification to said dwelling, a detached garage, a waste water treatment system, vehicular entrance, field entrance, demolition of existing outhouse structures and all associated site works.

Mishells Bandon Co Cork

195m
07/9114CONDITIONAL28 Jun 2007

Construction of livestock housing with 2 no. slatted tanks and associated works

Mishells Bandon

225m
05/4934CONDITIONAL11 Jul 2005

Dwellinghouse

Callatrim Bandon

227m
09/6574CONDITIONAL31 Jul 2009

Dwelling house (Change of plan from that permitted under planning ref.no. 09/5063)

Callatrim Bandon

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?