← Back to search

Coppengh , Tullow , County Carlow

N/A

Planning application 2360157

Carlow - Carlow County Council

Proposed Development

a five year planning permission for the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of c. 20.9 ha fixed panels on ground mounted frames with an export capacity of c. twenty five mega-watt, 1no. energy storage compound with an export capacity of twenty five mega-watts, customer switchgear container, 1no. DSO substation which will be connected to the national grid, electrical transformer and inverter units on an overall site area of c. 22.45 ha, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected life span of 35 years.

View the full application file on the council's planning portal →

Application Details

Location
Coppengh , Tullow , County Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Site Area
22.45 ha

Timeline

Registration Date
2 August 2023Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22272CONDITIONAL19 Aug 2022

Application for a five year planning permission for the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of a c.20.9 ha fixed panels on ground mounted frames with an export capacity of c. ten mega-watt, 1no. energy storage compound, customer switchgear container, 1no. DSO substation which will be connected to the national grid, electrical transformer and inverter units on an overall site area of c. 22.45 ha, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected lifespan of 35 years.

Coppenagh , Tullow , Co. Carlow

1m
22237N/A14 Jul 2022

the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of fixed panels on ground mounted frames, 1No. Energy storage compound, customer switchgear container, 1No. DNO substation which will be connected to the national grid, electrical transformer and inverter units, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected life span of 30 years.

Coppenagh , Tullow , Co. Carlow

75m
2237N/A10 Feb 2022

extension of planning permission ref: PL16/348. Development of a solar panel array consisting of 48,000m2 of solar panels on ground mounted steel frames, electrical control room, power interest units, underground cable ducts, CCTV, Lighting, security fencing and all associated works

Coppenagh , Tullow , Co. Carlow

765m
19296N/A26 Jul 2019

to construct a single storey extension to the side and rear of existing single storey dwelling, a single storey shed to the rear of existing dwelling, new waste water treatment system and percolation area, new bored well, widening of existing entrance and all associated site works

Coppenagh , Tullow , Co. Carlow

765m
19303CONDITIONAL1 Aug 2019

to construct a single storey extension to the side and rear of existing single storey dwelling, a single storey shed to the rear of existing dwelling, new waste water treatment system and percolation area, new bored well, widening of existing entrance and all associated site works

Coppenagh , Tullow , Co. Carlow

830m
22431N/A19 Dec 2022

for a detached home office and gym, garage area to the front with attic storage and all associated site works to the rear of existing two storey dwelling

Coppenagh , Tullow , Co Carlow

902m
2560397CONDITIONAL4 Dec 2025

a storey and a half extension to existing cottage and detached garden room to the rear of existing dwelling and all associated site works

Coppenagh , Tullow , Co. Carlow

1.0km
2660028CONDITIONAL9 Feb 2026

Alterations and additions to an existing storey and a half dwelling incorporating new single storey rear extensions, a new storey and a half side extension, new single storey front porch and a new single storey garage to the rear, new wastewater treatment unit and percolation area, and associated site works. To facilitate the new works, demolitions include the demolition of existing side and rear single storey living accommodation, demolition of an existing single storey shed to the side, and demolition of an existing rear garage. It is also proposed to widen the existing vehicular entrance to the site.

Tullowland , Tullow , Co. Carlow

1.0km
21296CONDITIONAL3 Aug 2021

Permission to demolish 24.53m2 of existing dwelling and construct a storey and a half extension to the rear and a single storey extension to the side of dwelling, new septic tank and percolation area and all associated works

Tullowphelim , Tullow , Co. Carlow

1.0km
22411REFUSED1 Dec 2022

existing home office and gym and wastewater treatment system with percolation area

Tullowphelim , Tullow , Co. Carlow

The submission window has closed

Observations on this application closed on Tuesday 5 September 2023, five weeks after it was received. The authority cannot accept a late submission.