← Back to search

Ballyknock , St. Mullins , Carlow

REFUSED

Planning application 2617

Carlow - Carlow County Council

Proposed Development

extension of duration of PL20/463 for construction of a single storey dwelling, with bored well, entrance off existing laneway, two storey agricultural shed, a waste water treatment system with sand polishing filter and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Sept 2026

  2. Decision: REFUSED

    4 Nov 2026

  3. Decision due

    8 Nov 2026

Application Details

Location
Ballyknock , St. Mullins , Carlow
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Carlow County Council

Timeline

Registration Date
14 September 2026Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
4 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
20463CONDITIONAL17 Dec 2020

Permission for construction of a single storey dwelling, with bored well, entrance off existing laneway, two storey agricultural shed, a waste water treatment system with sand polishing filter and all associated site works

Ballyknock , St. Mullins , Co. Carlow

98m
2460216CONDITIONAL26 Jul 2024

the extension of existing dwelling and all associated site works

Ballyknock , St. Mullins , Co. Carlow

621m
2168N/A1 Mar 2021

Permission for the erection of a dwelling house, garage, treatment system and percolation area and all associated site works

Dranagh , St. Mullins , Co. Carlow

621m
2197REFUSED25 Mar 2021

for the erection of a dwelling house, garage, treatment system and percolation area and all associated site works

Dranagh , St Mullins , Co. Carlow

622m
21315CONDITIONAL19 Aug 2021

Permission for the erection of a dwelling house, garage, treatment system and percolation area and all associated site works

Dranagh , St. Mullins , Co. Carlow.

629m
2360010N/A7 Feb 2023

permission for (1) the erection of extension to front of existing dwelling to facilitate a granny flat (2) extension to side of existing dwelling (3) increased roof ridge height (4) modifications to existing dwelling (Alterations to plans approved under PLREF 21413) and all associated site works

Dranagh , St.Mullins , Co.Carlow

630m
2360015CONDITIONAL14 Feb 2023

permission - Alterations to plans approved under PLREF 21413 - for (1) the erection of extensions to front and side of existing dwelling, incorporating a Granny Flat into the revised overall floor plan (2) increased roof ridge height (3) modifications to existing dwelling and retention permission for existing mobile home on site in use as temporary accommodation for the duration of construction works and all associated site work

Dranagh , St.Mullins , Co.Carlow

633m
21413CONDITIONAL1 Nov 2021

Permission for (1) the erection of granny flat style extension to existing dwelling (2) increased roof ridge height and conversion of attic space to habitable area (3) upgraded entrance and new boundary walls to accommodate improved sightlines (4) upgrade of existing sewerage system to a treatment system and percolation area and all associated site works

Dranagh , St. Mullins , Co. Carlow

649m
19234CONDITIONAL10 Jun 2019

erection of a dwelling house, domestic garage/store, treatment system and percolation area and all associated site works

Dranagh , St. Mullins , Co. Carlow

715m
2460218N/A29 Jul 2024

the refurbishment and extension to existing dwelling, demolition of existing outbuilding, new onsite wastewater treatment system and all associated site development works

Glebe , St. Mullins , Co. Carlow

The submission window has closed

A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Wednesday 2 December 2026 — for a fee of €220.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?