Proposed Development
a two-storey extension to the rear of existing two storey dwelling, detached garage with loft area, relocation of granted entrance, the installation of a septic tank and percolation area and all associated site works
Application Timeline
Application received
4 Sept 2026
Decision due (upcoming)
29 Oct 2026
Application Details
- Location
- Knocknatubrid , Tullow , Co. Carlow
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Carlow County Council
- Site Area
- 0.392 ha
Timeline
- Registration Date
- 4 September 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 29 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the redevelopment and reoccupation of semi derelict dwelling incorporating the provision of a new storey and a half type dwelling extension, proposed wastewater treatment system, bored well and all associated site development works
Knocknatubbrid , Tullow , Co. Carlow.
Permission for the refurbishment and alterations of existing semi derelict dwelling and the construction of an extension to same, proposed wastewater treatment system, bored well and all associated site development works
Knocknatubbrid , Tullow , Co. Carlow
permission to construct a one and a half storey dwelling with attached double garage, new entrance, bored well, waste water treatment system & percolation area with all associated site works
Knocknatubrid , Tullow , Co. Carlow
(i) Industrial / Commercial Building incorporating office accommodation, storage areas, manufacturing area and associated plant area (ii) Retention Permission to retain the existing open storage yard areas. (iii) Retention Permission to retain the existing Display area. (iv) Retention permission to retain the existing site entrances, car parking areas and existing Signage. (v) Full Planning Permission for a new Industrial Storage Unit together with the extension of the existing storage yard. (vi) Full Planning Permission to install a new wastewater treatment system together with all associated site development works
Knocknatubbrid , Tullow , Co Carlow
to construct a new cow storage cubicle house and storage tank, new above ground slurry store, concrete aprons and all associated works to my existing farmyard area
Rathglass , Tullow , Co Carlow
the partial demolition and the refurbishment including external alterations to existing dwelling. The construction of one & half storey type extension to said dwelling, the installation of wastewater treatment system and all associated siteworks
Rathglass , Tullow , Co. Carlow
The erection of a new two story dwelling house, domestic garage, domestic well, onsite waste water treatment system, percolation area and all associated site and landscaping works including a new site entrance.
Knocknatubbrid , Tullow , Co Carlow
the erection of a fully serviced part two storey, part single storey dwelling house, detached garage, septic tank, percolation area, landscaping and all associated siteworks. Proposed access to the site is via an existing residential access from the public road
Rathvarrin , Tullow , Co. Carlow
the erection of a fully serviced part two storey, part single storey dwelling house, detached garage, septic tank, percolation area, landscaping and all associated siteworks. Proposed access to the site is via an existing residential access from the public road
Rathvarrin , Tullow , Co. Carlow
the construction of a Single Storey Dwelling, detached domestic garage, wastewater treatment system, connection to mains water, splayed entrance and all associated site development works
Knocknatubrid , Tullow , Co. Carlow
Affected by this application?
Open for submissionsObservations close on Thursday 8 October 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?