Equity House , Deerpark Business Park , Dublin Road Carlow town
CONDITIONALPlanning application 2660295
Carlow - Carlow County Council
Proposed Development
proposed change of use of existing retail unit to office use (to ground floor of existing four storey complex) internal alterations and minor external alterations and associated works
Application Timeline
Application received
28 Sept 2026
Decision: CONDITIONAL
12 Nov 2026
Decision due
22 Nov 2026
Application Details
- Location
- Equity House , Deerpark Business Park , Dublin Road Carlow town
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Carlow County Council
- Site Area
- 0.125 ha
Timeline
- Registration Date
- 28 September 2026Other applications received that week
- Status
- DECISION MADE
- Decision
- CONDITIONAL
- Decision Date
- 12 November 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the change of use of first floor storage area to use as office and staff facilities. Permission for change of use at ground floor level from existing storage area to use as office and staff facilities, also change of use at ground floor level from office area to use as storage area. Permission for the construction of a new reception area to the Northeast elevation, permission for a new entrance and associated gates and fencing and all associated site works
Deerpark Business Complex , Dublin Road , Carlow
to construct 7 number commercial serviced sites, extension of existing road and footpath network, connection to existing on site services, street lighting, general landscaping, advertising signage and all associated site works
Deerpark Business Complex , Dublin Road , Carlow
to construct 7 number commercial serviced sites, extension of existing road and footpath network, connection to existing on site services and attenuation, street lighting, general landscaping, advertising signage and all associated site works
Deerpark Business Complex , Dublin Road , Carlow
development at a 1.54ha site consisting of a 38kV/MV electrical substation, underground cables (UGC) & assoc. works. Development will include: 1)Construction of a substation compound of approx. 2,850m2 gross area, with 2.6m high palisade fence around entire perimeter of substation, with the following electrical plant within the substation: 1No. prefabricated 38kV GIS module & foundation (c.31m2 & c.5.2m high); 1No. prefabricated MV GIS module & foundation (c.32m2 & c.4.7m high); 1No. prefabricated Control Room module & foundation (c.32m2 & c.4.7m high); 2No. 38/20kV 10 MVA transformers & assoc. bunds (c.15m2, c.4.5m high ea.); Telecommunication SCADA pole of c.10 metres in height; assoc. & ancillary outdoor electrical equipment & other apparatus, incl. installation of UGC; Internal access road of c.40m in length & c.5m wide within proposed substation; Compound lighting, boundary treatment, assoc. drainage, landscaping & all ancillary site development works; 2)Use of a portion of existing temporary road (c.200m in length) permitted as part of recent MSD Rathgall development (Planning Ref: 21/360 & 22/110) for permanent use to facilitate access to proposed substation; 3)Construction of new stone wall, fencing & gates at existing junction of temporary road with public road; 4)Construction of internal access road (c.140m in length) to proposed substation extending from existing temporary road on MSD lands to proposed substation; 5)Site clearance works related to proposed substation compound & access road incl. removal of existing shed, store building & flat at rear of former B&B (c.376m2 & c.7.3m high), asphalt concrete yard adjacent to shed, septic tank, associated manholes & pipework, trees & hedgerow over a distance of c.8m to facilitate construction of new internal access road, 6)Installation of c.1.3km of double-circuit 38kV UGC along R448 road between proposed substation & existing Carlow–Graigue 38kV OHL; 7)Installation of c.0.7km of single circuit 38kV UGC along R448 road between proposed substation & existing Carlow–Ballylinan 38kV OHL; 8)Installation of c.0.3km of 6 circuit MV UGC along R448 road between proposed substation & existing R448 roundabout; 9)Installation of new 12m high steel lattice mast on existing Carlow–Graigue 38kV OHL; 10)Replacement of existing timber poleset (IMP1395) with new 15m high steel lattice mast on existing Carlow–Ballylinan 38kV OHL - located in Co. Kildare. Application is accompanied by a Natura Impact Statement (NIS)
The townlands of Ballyvergal and Pollerton Little County Carlow and Knocknagee County Kildare ,
Permission to erect an aluminium framed terrace canopy including retractable fabric awning with glass windbreak side panels and doors, adjacent to the existing site canteen building at the biologics formulation and filling facility. The development is comprised of a single storey terrace cover with a gross floor area of 182 sqm all at ground level and alignment of existing hard landscaping. The purpose of the development is to provide ancillary eating and break facilities for site personnel.
Dublin Road , Pollerton Little , Oak Park Carlow
Permission for development consisting of Alterations to previously approved development for the construction of a health park reg. ref. 03/377, 05/181 & 05/692, including (i) redesign of proposed hospital and nursing home, to a proposed double storey 140 bedroom nursing home and hospital; (ii) provision of bicycle parking facilities for 28 bicycles; (iii) completion of car parking, landscaping, internal services, yards, ESB transformer room and refuse area; (iv) all associated site development and ancillary.
Ballylennon , Pollerton Little , Co. Carlow
A new laboratory building and related extensions to the existing biologics formulation and filling facility. The development comprises a combined gross floor area of c.4,088sqm, including; (i) a new three-storey laboratory building (c.3,320sqm and maximum height 18.19m); (ii) a two-storey extension to the existing production building (c.448sqm and maximum height 9.20m); (iii) a single-storey extension to the existing energy centre (c.220sqm and maximum height 10.20m); (iv) a new single storey workshop building (c. 100sqm and maximum height 4.70m); (v) associated site development works
Dublin Road , Pollerton Little and Oakpark , Carlow
Permission to erect an aluminium framed terrace canopy including retractable fabric awning with glass windbreak side panels and doors, adjacent to the existing site Canteen building at the biologics formulation and filing facility at Dublin Road, Pollerton Little and Oakpark, Carlow. The development is comprised of a single storey terrace cover with a gross floor area of 193sqm approximately all at ground level and alignment of existing hard landscaping. The purpose of the development is to provide ancillary eating and break facilities for site personnel
Dublin Road , Pollerton Little & Oakpark , Carlow
Development consisting of a proposed prefabricatated single storey office building (floor area792 sqm - to be known as Annex F) and associated site access footpaths, site works, landscaping and site services.
Dublin Road , Pollerton Little and Oakpark , Carlow
for a proposed Waste Storage Area (1600msq) in the existing north yard service area which will contain 1 no. small modular office (21.6msq), 1 no. external staging area covered shed (65msq), the existing modular Chemstore type waste storage units, compactors, waste skips, store, and bio store - all relocated from other areas within the existing site, 13 no. new Chemstore type units similar to the existing and all associated access footpaths, site works, landscaping and site services
Dublin Road , Pollerton & Oak Park , Carlow
The submission window has closed
A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Thursday 10 December 2026 — for a fee of €220.