← Back to search

Clonmacmara , Mullagh , Co. Cavan

N/A

Planning application 2460378

Cavan - Cavan County Council

Proposed Development

to construct a dormer style cottage, repair and convert derelict dwelling house on site for use as a domestic storage building, upgrade existing entrance off private access road and install a waste water treatment unit and percolation area together with all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Aug 2024

  2. Further information requested

    7 Oct 2024

  3. Application withdrawn

    23 May 2025

Application Details

Location
Clonmacmara , Mullagh , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.26 ha
Floor Area
150 sq m
Residential Units
1

Timeline

Registration Date
14 August 2024
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
23 May 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560249CONDITIONAL21 May 2025

to construct a dormer style cottage, repair and convert derelict dwelling house on site for use as a domestic storage building, upgrade existing entrance off private access road and install a waste water treatment unit and percolation area together with all ancillary works on site- SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED

Clonmacmara , Mullagh , Co. Cavan

95m
22392CONDITIONAL22 Sept 2022

of (1) alterations and amendments made during construction to floor plan layouts and elevations of dormer type dwelling, (2) revised site layout all from that previously granted under planning reference 08/948

Clonmacmara , Mullagh , Co Cavan

230m
17150CONDITIONAL19 Apr 2017

to construct a proposed detached domestic garage and all associated site works

Clonmacmara , Mullagh , Co. Cavan

240m
2560615CONDITIONAL15 Oct 2025

for RETENTION for: (a) single storey front porch, (b) detached domestic garage, planning PERMISSION is sought for (c) revised site boundaries, (d) together with all ancillary site works associated with the above

Corryrourke , Mullagh , Co Cavan

446m
18421CONDITIONAL10 Oct 2018

to construct a storey and a half type dwelling, a detached domestic garage, form new entrance from roadway, install waste water treatment system and percolation area and all associated site works

Clonmacmara , Mullagh , Co. Cavan

468m
2460253CONDITIONAL7 Jun 2024

to (a) refurbish, carry out alterations and extend existing dwelling (b) construct a dormer type extension (c) remove existing septic tank and install proprietary wastewater sewage treatment system and percolation area (d) upgrade existing entrance (e) demolish existing outbuilding (f) construct new detached domestic garage (g) together with all associated site works

Clonmacmara , Mullagh , Co. Cavan

603m
23339REFUSED22 Dec 2023

for a dormer style dwelling, proprietary effluent treatment system, entrance walls and piers and associated site works

Corragloon , Mullagh , Co Cavan

609m
2463CONDITIONAL1 Oct 2024

for a dormer style dwelling, proprietary effluent treatment system, entrance walls and piers and associated site works

Corragloon , Mullagh , Co Cavan

658m
2660425N/A31 Jul 2026

to (a) construct a part single storey / part two storey style dwelling incorporating a semi-basement, (b) form new entrance onto public road (c) install proprietary wastewater sewage treatment system and percolation area (d) together with all associated site works

Corragloon , Mullagh , Co. Cavan

818m
21398CONDITIONAL28 Jun 2021

to construct a detached single storey pitched roof shed building with an extended roof to provide an outdoor covered storage area to the rear of the existing single storey dwelling and all necessary ancillary site development works to facilitate this development .

Corryrourke , Mullagh , Co Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?