← Back to search

Murmod , Virginia , Co. Cavan

N/A

Planning application 2560140

Cavan - Cavan County Council

Proposed Development

for

  1. (a)
    extension link between existing house & domestic garage
  2. (b)
    existing outbuilding
  3. (c)
    existing retaining walls
  4. (d)
    revised location of existing site entrance and roadside boundary wall (Development previously granted under Planning Ref. No. 00/369)
View the full application file on the council's planning portal →

Application Details

Location
Murmod , Virginia , Co. Cavan
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cavan County Council
Site Area
0.36 ha

Timeline

Registration Date
29 March 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
2560153CONDITIONAL4 Apr 2025

for (a) extension link between existing house & domestic garage (b) existing outbuilding (c) existing retaining walls (d) revised location of existing site entrance and roadside boundary wall (Development previously granted under Planning Ref. No. 00/369)

Murmod , Virginia , Co. Cavan

120m
2560341CONDITIONAL25 Jun 2025

for (A) revised location of a single-storey domestic garage previously approved under Planning Ref. No. 061383, (B) the construction of an additional storey above the garage to accommodate a one-bedroom granny flat; and (C) the construction of a single-storey building to the rear of the existing dwelling to provide a workshop and a domestic gym, along with all associated site works

Murmod , Virginia , Co. Cavan

288m
18127CONDITIONAL28 Mar 2018

to construct a single storey dwelling, a detached domestic garage, form new entrance from public road, install waste water treatment system and percolation area and all associated site works

Murmod , Virginia , Co. Cavan

352m
17107CONDITIONAL23 Mar 2017

to construct a single storey extension to the side of the existing dwelling, a detached domestic garage with car port and all associated site works

Murmod , Virginia , Co Cavan

352m
22242REFUSED17 Jun 2022

EXTENSION OF DURATION of 17/107: to construct a single storey extension to the side of the existing dwelling, a detached domestic garage with car port and all associated site works

Murmod , Virginia , Co Cavan

356m
2352CONDITIONAL15 Feb 2023

to construct a single-storey extension to the side of the existing dwelling, a detached domestic garage with a carport, and all associated site works

MURMOD , VIRGINIA , CO. CAVAN

878m
21562N/A8 Sept 2021

to complete works to partially constructed dwelling, commenced under Planning Reg: 04/2238. PERMISSION is also sought to alter plans and elevations of dwelling and complete all ancillary site works

Murmod , Virginia , Co. Cavan

878m
2560746N/A17 Dec 2025

to (a) demolish existing concrete slab, (b) construct a story and a half split level style dwelling, (c) construct a detached single-story domestic garage, (d) form new entrance onto lane, (e) form new Wastewater Treatment System, together with all associated site works

Murmod , Virginia , County Cavan

879m
2660001N/A9 Jan 2026

to (a) demolish existing concrete slab, (b) construct a story and a half split level style dwelling, (c) construct a detached single-story domestic garage, (d) form new entrance onto lane, (e) form new Wastewater Treatment System, together with all associated site works

Murmod , Virginia , County Cavan

879m
2660042CONDITIONAL3 Feb 2026

to (a) demolish existing concrete slab (formed under previous planning application ref no. 04/2238), (b) construct a story and a half split level style dwelling, (c) construct a detached single-story domestic garage, (d) form new entrance onto lane, (e) form new wastewater treatment system, together with all associated site works.

Murmod , Virginia , County Cavan

The submission window has closed

Observations on this application closed on Friday 2 May 2025, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?