← Back to search

Drumhurt kill , Cootehil , Co. Cavan

N/A

Planning application 2660475

Cavan - Cavan County Council

Proposed Development

to carry out the following alterations to an existing dwelling house. (1) Renovate existing single storey dwelling house comprising of alterations to elevations, internal fit-out works, (2) Construct new single storey extension to rear, (3) Form new vehicular site entrance onto public road, (4) Install new mechanical wastewater treatment system & percolation area , (5) Construct new detached domestic garage. Together with all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Aug 2026

  2. Decision due (upcoming)

    20 Oct 2026

Application Details

Location
Drumhurt kill , Cootehil , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.39 ha
Floor Area
69 sq m
Residential Units
1

Timeline

Registration Date
26 August 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
20 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

489m
21176CONDITIONAL29 Mar 2021

to construct a new single storey classroom, new special educational teacher support room (SEN), relocate toilets, demolition of existing shelters & shed, connection to on site services, and associated works

Kill National School , Drumhurt , Kill

489m
19403CONDITIONAL14 Oct 2019

for new Astro Turf Playing Pitch with new flood lighting, associated perimeter fencing, new footpath and all ancillary works

Drumhurt , Kill , Co. Cavan

489m
17286CONDITIONAL27 Jun 2017

new single storey prefabricated classroom, connection to on site services, new carpark and associated works

Kill National School , Drumhurt , Kill

489m
20387CONDITIONAL4 Sept 2020

to continue the use of an existing prefabricated classroom for a further period of time, in connection with Planning Ref 17/286

Kill National School , Drumhurt , Kill

489m
19245CONDITIONAL24 Jun 2019

for development of a formal carpark/set down area, lighting and associated works, all connected to existing services on site

Drumhurt , Kill , Co. Cavan

522m
17494CONDITIONAL24 Nov 2017

to construct a new single storey classroom, connection to on site services, and associated works. Significant further information and revised plans have been submitted

Kill National School , Drumhurt , Kill

533m
17468CONDITIONAL8 Nov 2017

to alter the previously approved application, planning permission reference 16/319. Alterations include; a reduction in overall floor area of the proposed two storey dwelling, elevation changes, alterations to the internal layout, changes to the site layout and all associated site works

Cornamucklagh and Drumhurt , Kill , Co. Cavan

585m
2660294CONDITIONAL28 May 2026

for (1) car parking and set-down area to facilitate a one-way vehicular access and egress system; (2) erection of a single-storey extension to the front of the building (3) external disabled access ramp (4) internal and external alterations to the existing building; and (5) modification of Condition 2 of Planning Permission Ref. No. 2460237 to permit operational hours from 08:00 to 18:00, together with all ancillary site development works

Drumhurt , Kill Cootehill , Co Cavan.

585m
2460237CONDITIONAL29 May 2024

for 1) Retain change of use from existing dwelling to after school childcare facility, external play area and fencing, 2) Planning permission sought for roof structure above external play area and alterations to site layout to include new path access to existing carpark and all ancillary works

Drumhurt , Kill , Cootehill

799m
2560205CONDITIONAL29 Apr 2025

to (1) Construction of underground slurry and soiled water storage tank with slatted and solid passage areas at ground level, (2) Completion of all ancillary site works and associated site structures

Cornabeagh , Kill , Cootehill Co. Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?