← Back to search

ESB NETWORKS , MOYNEHALL , CAVAN

N/A

Planning application 2660490

Cavan - Cavan County Council

Proposed Development

for a 4-bay storage shed (22.5m x 8m x 6m), that includes no. 3 open bays with no. 1 closed bay, secured by a roller-door with side pedestrian access. The structure shall be erected on a proposed concrete pad located on an existing area of hard standing. The application includes all ancillary works associated with the development located to rear of the existing depot

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Aug 2026

  2. Decision due (upcoming)

    25 Oct 2026

Application Details

Location
ESB NETWORKS , MOYNEHALL , CAVAN
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.18 ha

Timeline

Registration Date
28 August 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
25 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

38m
21780CONDITIONAL23 Dec 2021

for development consisting of the construction of a 30 metre high monopole type communications structure and its associated antennae, communication dishes and associated ground equipment, within a 2.4m high palisade fence compound

ESB Networks , Moynehall Cavan , Co. Cavan

55m
21107N/A26 Feb 2021

for the construction of a 36 metre high free standing lattice communications structure and its associated antennae, communications dishes and ground equipment, within a 2.4m high palisade fence compound

ESB Networks , Moynehall , Co Cavan

55m
20365N/A26 Aug 2020

for development consisting of the construction of a 36 metre high free standing lattice communications structure and its associated antennae, communication dishes and ground equipment within a 2.4m high palisade fence compound

ESB Networks , Moynehall , Co. Cavan

140m
17404CONDITIONAL19 Sept 2017

to erect new roof structure over existing open machinery compound and replace existing fencing, all to rear of former Cavan Car Auctions including all ancillary site works

Moynehall , Cavan

142m
21741CONDITIONAL8 Dec 2021

to erect new storage unit to rear of Moynehall Retail Park with connection to all existing services and ancillary site works

Moynehall & Cornagleragh (or Oldtown) , Co. Cavan

144m
22256CONDITIONAL16 Jun 2022

to alter previously approved storage unit (Pl. Ref. 21/741) to rear of Moynehall Retail Park. Alterations to include changes to site layout and boundary, extension of proposed floor area, new dock leveler & associated alterations to elevations, with connection to all existing services and all ancillary works

Moynehall & Cornagleragh (or Oldtown) , Cavan , Co Cavan

146m
2660089REFUSED27 Feb 2026

for erection of 1no. 3-bedroom 2 storey detached dwelling, connection to existing services and all ancillary works

Oldtown Manor , Cornagleragh or Oldtown , Cavan

153m
2360337CONDITIONAL21 Dec 2023

to erect 20 no. fully serviced 2-storey dwellings. The development will consist of 10no. 3-bed semi-detached dwellings, 2no. 3-bed detached dwellings and 2no. two storey terraced blocks of 4no. 2-bed units, extension of existing service road, connection to existing services and all ancillary works at development known as ‘Oldtown Manor’

Cornagleragh or Oldtown , Cavan , Co. Cavan

165m
2460471CONDITIONAL4 Oct 2024

to alter the rear boundary treatment for dwellings 16-44 as previously granted under planning reference no. 22/530 & 23/60337 and all ancillary works at development known as 'Oldtown Manor'

Cornagleragh or Oldtown , Cavan , Co. Cavan

184m
2290CONDITIONAL4 Mar 2022

to alter the site layout and site boundary to approved 96-bedroom two storey nursing home application (Pl. Ref. No. 15/270 & Pl. Ref. No. 20/588) and all associated & ancillary site works

Oldtown , Cavan , Co. Cavan

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?