Proposed Development
to upgrade an existing agricultural entrance to a Forest Road Bellmouth to facilitate timber harvesting, haulage operations and associated site works to existing forestry lands
Application Timeline
Application received
12 Sept 2019
Further information requested
30 Oct 2019
Further information received
15 Nov 2019
Decision: CONDITIONAL
6 Dec 2019
Decision due
12 Dec 2019
Grant issued
16 Jan 2020
Application Details
- Location
- Tooreen , Miltown Malbay , Ennis
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 12 September 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 December 2019
- Grant Date
- 16 January 2020
- Permission Expires
- 15 January 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to extend and renovate the existing dwelling house along with elevation changes to the house and to construct a new wastewater treatment system along with all associated site works and services
Tooreen , Miltown Malbay , Co. Clare.
to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
Tooreen , Miltown Malbay , Co Clare
to alter the planning drawings granted under P22/1019 along with ancillary site works
Tooreen , Miltown Malbay , Co. Clare
for the development of a domestic garage ancillary to dwelling house granted permission under planning reference P23/617 together with ancillary site works
Ballynew , Miltown Malbay , Co Clare
the development will consist of a dwelling house with proprietary wastewater treatment system and polishing filter, new entrance at public road and upgraded access way along existing agricultural track together with ancillary site works
Ballynew , Miltown Malbay , Co Clare
for development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
Ballynew , Miltown Malbay , Co. Clare
To RETAIN 2 No French doors and existing balcony to rear elevation and to install a new balcony to rear of dwelling.
Slievenalicka , Miltown Malbay , Co Clare
to construct an extension on the Northwest side of the existing school consisting of a G.P. Hall and ancillary site works
Slievenalicka , Miltown Malbay , Co Clare
the development will consist of the replacement of existing substandard dwelling with a new dwelling house and the replacement of existing septic tank with a proprietary wastewater treatment system and polishing filter together with ancillary works
Slievenalicka , Miltown Malbay , Co Clare
for the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
Tooreen , Slievenalicka Illaunbaun , Drumbaun and Lackamore Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?