← Back to search

Kilfarboy , Miltown Malbay , Co Clare

CONDITIONAL

Planning application 21195

Clare - Clare County Council

Proposed Development

to construct a two storey extension to include a re-located bedroom to facilitate a home office, a utility room and a plant room

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Mar 2021

  2. Decision due

    28 Apr 2021

  3. Decision: CONDITIONAL

    28 Apr 2021

  4. Grant issued

    8 Jun 2021

Application Details

Location
Kilfarboy , Miltown Malbay , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
4 March 2021Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 April 2021
Grant Date
8 June 2021
Permission Expires
7 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

62m
22536CONDITIONAL16 Jun 2022

of a reconstructed structure on the footprint of a longstanding stone cabin with connection to existing on-site facilities and for a change of use from agricultural use to a pre school facility

Kilfarboy , Miltown Malbay , Co Clare

1.1km
22570CONDITIONAL28 Jun 2022

for the development which will consist of the erection of a 2.39m high paladin fence measuring 30.4m in length and located along the northwestern boundary of Rockmount Water Treatment Plant

Leeds (townland) , Miltown Malbay , Co Clare

1.1km
19300CONDITIONAL17 Apr 2019

for the development comprising a water storage reservoir at the water treatment plant site in Leeds, Miltown Malbay Co Clare. The development will comprise the construction of a 16m diameter circular precast concrete storage reservoir for potable water. The Development will also include the decommissioning and demolition of the existing steel tanks , buildings and storage reservoir. New boundary walls and fencing will also be constructed along boundary of the site, as well as associated ancillary works and other enabling civil works,

Leeds , Miltown Malbay , Co Clare

1.2km
18115REFUSED15 Feb 2018

to construct a new dwelling with an on-site wastewater treatment system, garage, new entrance and ancillary site works. Permission is also sought for a commercial shed to the rear of the site and ancillary site works

Ballyvaskin , Miltown Malbay , Co. Clare

1.4km
22144CONDITIONAL17 Feb 2022

of the following; a) the alterations to the existing dwelling house b) the garage/shed as constructed along with associated site works

Ballyvaskin North , Miltown Malbay , Co Clare

1.4km
2560578REFUSED19 Sept 2025

for the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbine to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction and operation of the turbine. • Two borrow pits. • One peat repository area for peat and spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent and Temporary tree felling to accommodate the construction and operation of the turbine. • Signages. • All associated site development works. This application is seeking a 10-year planning permission, together with a 35-year operational life for the wind turbine from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes. The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) and Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the Planning Authority with the application

Slievenalicka , Illaunbaun Drumbaun , and Lackamore

1.4km
2660207REFUSED31 Mar 2026

for the development of the Slievenalicka wind turbine in the townlands of Tooreen, Slievenalicka, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • One peat repository area for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the planning application and will be submitted to the Planning Authority with the application

Tooreen , Slievenalicka , Drumbaun & Lackamore

1.5km
20566CONDITIONAL19 Aug 2020

to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works

Illaun , Miltown Malbay , Co Clare

1.6km
17150CONDITIONAL2 Mar 2017

to construct a single storey extension to the western side of existing dwelling house along with ancillary site works

Slievenalicka , Miltown Malbay , Co. Clare

1.6km
1745N/A26 Jan 2017

to construct a single storey extension to the western side of existing dwelling house along with ancillary site works

Slievenalicka , Miltown Malbay , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?