Proposed Development
to RETAIN the following
- a)the side and rear extensions to the dwelling house
- b)additional windows and changes to windows on the elevations of the dwelling house
- c)the boundary wall and site entrance as constructed along with associated site works
Application Timeline
Application received
19 May 2021
Decision: CONDITIONAL
9 Jul 2021
Decision due
13 Jul 2021
Grant issued
11 Aug 2021
Application Details
- Location
- Dough , Spanist Point , Co Clare
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
- Floor Area
- 12 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 19 May 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 July 2021
- Grant Date
- 11 August 2021
- Permission Expires
- 10 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
Dough , Miltown Malbay , Co. Clare
to (a) alter, renovate and extend existing dwelling house (b) update existing wastewater treatment arrangement together with all associated site development works and services
Dough , Miltown Malbay , Co. Clare V95 N2E6
to construct a dwelling house, wastewater treatment system, road entrance and all associated site works
Dough Tld , Miltown Malbay , Co Clare
to construct a storage shed along with associated site works
Dough , Spanish Point , Co Clare
to construct a Hobby Garage/Store and associated site works on a site adjacent to their existing dwelling house
Dough Tld. , Spanish Point , Co. Clare
for the refurbishment and extension of an existing house and associates site works.
Dough Tld. , Miltown Malbay , Co. Clare
for the following works, (A) Refurbish existing derelict including the raising of the roof height and changes to the layout of the dwelling, (B) Construct a single storey extension t the rear of the dwelling, (C) Construct garage, (D) Install new effluent treatment system, and (E) Relocate the existing site entrance, all with associated site works
Dough , Spanish Point , Co Clare
to construct the following (a) A golf training room with compressor room and store room at basement level (b) A covered area between the existing clubhouse and the proposed training room (c) A small extension off the lounge to front of building (d) A refuse area with low walls on either side parallel to clubhouse (e) Enlarge window to front of building
Dough , Spanish Point , Co Clare
to construct an extension to rear of existing clubhouse
Dough , Spanish Point , Co Clare
to erect dwelling house, foul sewer treatment plant, percolation area and new site entrance
Leagard South , Miltown Malbay , Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?