Cloughaun More Td , Miltown Malbay , Co Clare
CONDITIONALPlanning application 22129
Clare - Clare County Council
Proposed Development
to upgrade / improve existing access road for the purposes of extracting timber
View the full application file on the council's planning portal →Application Timeline
Application received
15 Feb 2022
Further information requested
7 Apr 2022
Further information received
3 Aug 2022
Decision: CONDITIONAL
9 Sept 2022
Decision due
12 Sept 2022
Grant issued
17 Oct 2022
Application Details
- Location
- Cloughaun More Td , Miltown Malbay , Co Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 15 February 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 September 2022
- Grant Date
- 17 October 2022
- Permission Expires
- 16 October 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to erect agricultural storage shed and new site entrance
Cloghaun Beg , Miltown Malbay , Co Clare
to erect agricultural storage shed and new site entrance
Cloghaun Beg , Miltown Malbay , Co Clare
to erect agricultural storage shed
Doonsallagh East , Miltown Malbay , Co Clare
to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Glendine North , Miltown Malbay , Co Clare
for development of a livestock slatted unit with associated ancillary siteworks
Letterkelly , Miltown Malbay , Co. Clare
(Reference No P23/384) to construct a dwelling house and garage, with effluent treatment system, new entrance from public road with planted earthen berm side and rear boundaries, and all associated site works
Cloghaun More , Miltown Malbay , Co Clare
to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, with planted earthen berm side and rear boundaries and all associated site works
Cloghaun More , Miltown Malbay , Co Clare
for a 10-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun beg, Silverhill, Doonsallagh East, Shanavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: i. Up to 8 No. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological Mast with a maximum height of up to 110 metres; iv. Underground cabling (33kV) connecting the proposed turbines to an existing 110kV substation in the townland of Knockalassa; v. Permanent extension to the 110kV substation at Knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi Upgrade of access junctions; vii Upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. borrow pits; ix 2 no. temporary construction compounds; x. Site Drainage; xi Forestry Felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development.
Glendine North Fahanlunaghta More , Curraghodea LetterKelly Cloghaun More Cloghaun Beg , Silverhill Doonsallagh East Shanavogh East and Knockalassa Co. Clare
to renovate, extend the existing Dwelling, creating a Granny Flat within a section of the existing dwelling, upgrade the existing septic tank & all other associated site and ancillary works
Knockbrack Miltown Malbay , Co. Clare , V95 D2H4
for a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed turbines to an existing 110kV substation in the townland of Knockalassa; v. Permanent extension to the 110kV substation at Knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi. Upgrade of access junctions; vii. Upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. borrow pits; ix. 2 no. temporary construction compounds; x. Site drainage; xi. Forestry felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development
Glendine North Fahanlunaghta More Curraghodea , Letterkelly Cloghaun More Cloghaun Beg Tooreen Silverhill , Doonsallagh East Shanavogh East and Knockalassa Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?