Ballycasey Beg , Culleen , Newmarket-on-Fergus Co. Clare
N/APlanning application 25190
Clare - Clare County Council
Proposed Development
for development which will consist of 1. Land reclamation for agricultural purposes by levelling ground between two contours using imported inert soil and stone class (170504) concrete class (170101) for roadways, together with the associated site works. 2 RETENTION permission of land reclamation of existing lands for agricultural use under planning references 20/712 and 21/347
View the full application file on the council's planning portal →Application Timeline
Application received
12 Jun 2025
Further information requested
1 Aug 2025
Application withdrawn
5 Mar 2026
Application Details
- Location
- Ballycasey Beg , Culleen , Newmarket-on-Fergus Co. Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 12 June 2025
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 5 March 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works
Culleen , Drumline , Co Clare
the development consists of the construction of a slatted unit and associated site works
Culleen , Drumline , Co Clare
to renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
Cullen , Newmarket-on-Fergus , Co Clare
for the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works
The Orchard , Drumline , Newmarket-on-Fergus Co Clare
To construct a single dwelling house, advanced water treatment system and ancillary site works.
Culleen , Newmarket-on-fergus , Co. Clare
to erect signage to logistics (warehouse and distribution) building
Shannon Free Zone , Ballycasey Beg , Smithstown Shannon
to construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development
East Park Shannon Free Zone , Ballycasey Beg , Smithstown Shannon
for the construction of an entrance, dwelling house, garage, driveway, advanced waste water treatment system together with all ancillary site development works and services
Culleen , Newmarket on Fergus , Co. Clare
for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.
Drumline , Co. Clare
for the development at this site at the Townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline, and Ballycasey Beg, Co. Clare. The proposed development will consist of an amendment to a previously consented development (Planning Reference 25/260 by Clare County Council) comprising of; (i) the relocation of the permitted IPP substation, (ii) revised 110 kV grid connection infrastructure including the provision of two 110 kV lattice towers, underground cable ducting and associated infrastructure, (iii) amendments to the electrical interface connection arrangement, (iv) the provision of palisade fencing and associated ancillary infrastructure, (v) a minor extension to the permitted development boundary to the west of the site to facilitate the proposed 110 kV lattice tower and associated underground cable infrastructure, and (vi) all associated ancillary works required to facilitate connection to Drumline 110 kV Substation, Co. Clare. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of— a) 5 weeks, or b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump. beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.
Mogullaan Crossagh Rathlaheen South Culleen Drumline and Ballycasey Beg , Newmarket-on-Fergus , Co. Clare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?