Drumline , Newmarket-on-Fergus , Co. Clare

CONDITIONAL

Planning application 2560820

Clare - Clare County Council

Proposed Development

to construct an extension to existing dwelling to comprise of kitchen / dining / livingroom and utility including the refurbishment and modification of existing dwelling and permission to demolish existing extension to west of dwelling including all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2025

  2. Decision: CONDITIONAL

    18 Feb 2026

  3. Decision due

    21 Feb 2026

  4. Grant issued

    25 Mar 2026

Application Details

Location
Drumline , Newmarket-on-Fergus , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.32 ha

Timeline

Registration Date
19 December 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 February 2026
Grant Date
25 March 2026
Permission Expires
24 March 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

299m
2660169CONDITIONAL19 Mar 2026

to demolish existing damaged dwelling and construct new dwelling on existing site along with all associated works

Drumline , Newmarket on Fergus , Co. Clare

402m
2360471N/A8 Nov 2023

to RETAIN existing 1st floor living area and rear storage shed

Drumline , Newmarket on Fergus , Co. Clare

402m
2360510CONDITIONAL29 Nov 2023

of the following: a) RETAIN existing 1st floor living area and rear storage shed. b) PERMISSION to extend the front wall of the house to enlarge existing bedrooms

Drumline , Newmarket on Fergus , Co Clare

555m
19882CONDITIONAL12 Nov 2019

for the development of an extension to existing dwelling which will include a side and rear extensions and all associated site works

Drumline , Newmarket on Fergus , Co. Clare

600m
1731CONDITIONAL23 Jan 2017

for a Ten Year Permission for the development of a solar PV farm consisting of up to 34,334 sq.m of solar panels on ground mounted steel frames, 1 no. substation, 2 no. inverter cabins, a battery storage container, underground cable ducts, a temporary site compound area and ancillary facilities, boundary security fencing, site landscaping, upgrade to existing farm track and new internal access track, CCTV and all associated site works. The development includes the demolition of the existing ruined cottage on site. The proposed solar farm will be connected to the National Grid

Firgrove , Sixmilebridge

616m
2660525N/A14 Aug 2026

for the development at this site at the Townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline, and Ballycasey Beg, Co. Clare. The proposed development will consist of an amendment to a previously consented development (Planning Reference 25/260 by Clare County Council) comprising of; (i) the relocation of the permitted IPP substation, (ii) revised 110 kV grid connection infrastructure including the provision of two 110 kV lattice towers, underground cable ducting and associated infrastructure, (iii) amendments to the electrical interface connection arrangement, (iv) the provision of palisade fencing and associated ancillary infrastructure, (v) a minor extension to the permitted development boundary to the west of the site to facilitate the proposed 110 kV lattice tower and associated underground cable infrastructure, and (vi) all associated ancillary works required to facilitate connection to Drumline 110 kV Substation, Co. Clare. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of— a) 5 weeks, or b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump. beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.

Mogullaan Crossagh Rathlaheen South Culleen Drumline and Ballycasey Beg , Newmarket-on-Fergus , Co. Clare

640m
17156CONDITIONAL3 Mar 2017

for the following: 1 (a) RETAIN garage door on East elevation of garage/store, 1(b)RETAIN door on West elevation of garage/store, 1(c) RETAIN window on Southern gable of garage/store. 2 RETAIN shed to the back of dwelling house, 3(a) RETAIN 2 no. Windows and one pair of sliding doors on Eastern elevation of dwelling house. 3(b) RETAIN window to front ( Southern ) elevation of dwelling house

Drumline , Newmarket-on-Fergus , Co. Clare

646m
2549CONDITIONAL24 Feb 2025

for the proposed installation of solar panels on a steel frame structure to be erected over the roof of an existing telecommunication cabin (covering an area of approximately 48 sq.m to a maximum height of 4.8 metres above ground level). To include all ancillary development works and landscaping to the southwest of the telecommunications compound

ESBs' Drumline 110kV Substation , Drumline , Shannon Co Clare

662m
24405CONDITIONAL3 Dec 2024

to replace the pyrite damaged dwelling on site with a new dwelling & all other associated site and ancillary works

Poppintree Lodge Ballycaseymore , Newmarket-on-Fergus , Co Clare V14 KX75

692m
2560529CONDITIONAL29 Aug 2025

for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.

Drumline , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?