← Back to search

Urlanmore , Newmarket-on-fergus , Co. Clare

N/A

Planning application 2660645

Clare - Clare County Council

Proposed Development

to retain changes to building (Granted under Planning Reference Number P25/60420) as constructed, to include alterations to front elevation to include the omission of the front recess, the omission of Apex glazing to front Gable window, the omission of glazing to top & side of front door, the omission of 1 window in master bedroom. Retention permission is also sought for the omission of 2 double doors to south elevation and replacement with 1 window, the omission of corner window to south & east elevations and replacement with 1 window to east elevation including ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Oct 2026

  2. Decision due (upcoming)

    29 Nov 2026

Application Details

Location
Urlanmore , Newmarket-on-fergus , Co. Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council
Site Area
0.185 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
5 October 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
29 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560420CONDITIONAL7 Jul 2025

for the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works

Urlanmore , Newmarket-on-Fergus , Co. Clare

22m
20232CONDITIONAL6 Apr 2020

to construct steel clad domestic garage to rear of existing dwelling including ancillary site works

Urlanmore , Newmarket-on-Fergus , Co Clare

79m
20323CONDITIONAL21 May 2020

for the construction of bay window, sunroom, kitchen, dining room, study, and garage as built including ancillary site works

Urlanmore , Newmarket-on-Fergus , Co Clare

352m
211306N/A8 Dec 2021

for development, the development will consist of the construction of a light engineering workshop with a waste water treatment system with percolation area and associated site works

Urlan More , Newmarket-on-Fergus , Co Clare

398m
1728CONDITIONAL23 Jan 2017

to RETAIN an extension to a garage

Urlanmore , Newmarket-on-Fergus , Co. Clare

415m
19935CONDITIONAL28 Nov 2019

to construct an extension to the side of the existing dwelling house

Urlan More , Newmarket-on-Fergus , Co Clare

433m
2660246CONDITIONAL16 Apr 2026

for the following development: (a) construction of a first floor extension to the rear of the existing dwelling. (b) construction of covered patio area to the rear of the existing dwelling. (c) changes to the internal layout of the dwelling. (d) alterations to the elevations of the existing dwelling and garage. (e) all associated site works and services

Urlan More , Newmarket-on-Fergus , Co. Clare

468m
2460413CONDITIONAL30 Aug 2024

for the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works

Urlanmore , Newmarket on Fergus , Co. Clare

519m
19189CONDITIONAL15 Mar 2019

for the part demolition and construction of a single storey extension to the front and side of existing single storey dwelling.

Newmarket on fergus , Co Clare

552m
2360235CONDITIONAL4 Jul 2023

for the construction of a dwellinghouse, new vehicular entrance & proprietary waste water treatment plant including all ancillary site works

Urlanmore , Newmarket-on-Fergus , Ennis

Affected by this application?

Open for submissions
26days left to make a submission

Observations close on Sunday 8 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?