Maxol Service Station , Skehard Road , Cork

CONDITIONAL

Planning application 1737306

Cork - Cork City Council

Proposed Development

permission is sought for the installation of a sound protection wall

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Mar 2017

  2. Decision: CONDITIONAL

    26 Apr 2017

  3. Decision due

    1 May 2017

  4. Grant issued

    29 May 2017

Application Details

Location
Maxol Service Station , Skehard Road , Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council
Site Area
0.195 ha

Timeline

Registration Date
6 March 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 April 2017
Grant Date
29 May 2017

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

108m
1737303N/A3 Mar 2017

permission is sought to alter and to extend the existing car park to accommodate 11 new car parking spaces and all associated site works

Lough Mahon House , Blackrock , Cork

121m
1838190CONDITIONAL21 Dec 2018

Permission for single storey extension to side of existing dwelling and elevational changes to front and side of existing dwelling.

1 Oakdene , Skehard Road , Cork

147m
1838104CONDITIONAL26 Oct 2018

Permission for retention of first floor gable window which was an addition to plans and particulars submitted... under Planning T.P. No. 17/37268.

1 & 2 The Groves , Ballinsheen , Skehard Road

148m
1737268CONDITIONAL8 Feb 2017

permission for change of house type and reduction in density from 3 no. townhouses to 2 no. semi-detached dwellings and all associated ancillary site development works as previously granted under TP.06/30759 and an extension of duration granted in 2012

Ballinsheen , Skehard Road , Blackrock

153m
1737286CONDITIONAL17 Feb 2017

permission is sought for the construction of a new entrance canopy and minor works to existing façade including modifications and replacement of existing door and windows and all necessary ancillary development works to the existing office building

Mahon Business Park , Former Motorola Site , Bessboro Road

153m
1938875CONDITIONAL15 Nov 2019

Permission for the construction of 12,004 sq. metres (gross) of office floorspace comprising of a 4-storey office building with an option for internal sub-division to provide up to 16 no. office units, 174 no. surface car parking spaces and 66 no. undercroft /semi-basement car parking spaces and all associated ancillary development works including landscaping, drainage, plant and solar panels (provided at roof level), 1 no. smoking shelter, motorbike and bicycle parking and 1 no. switch room, electrical substation and bin stores.

Blackrock Business Park , Bessboro Road , Mahon

202m
2443504CONDITIONAL16 Dec 2024

Permission for the change of use of part of the existing office building to provide a health centre/clinic use to include medical/health services (Class 8) with consulting rooms/clinics storage reception staff canteen ancillary office/administrative areas signage and associated site works.

Blackrock Business Park , Bessboro Road , Mahon

213m
1837984CONDITIONAL19 Jul 2018

Permission for retention is sought for prefabricated office of 89 m sq, along with associated access ramps and covered walkways.

Central Statistics Office , Skehard Road , Blackrock

234m
1938979CONDITIONAL17 Dec 2019

Permission for modifications to Block 2 permitted under Cork City Council Ref. 16/37233 (An Bord Pleanala Ref. PL 28.249400) at Eden, Blackrock, Cork. The proposed development consists of internal modifications to the permitted ground floor level to provide for an increase in the size of the permitted crèche associated elevational changes and all ancillary site development works. The proposed modifications will result in a reduction of the number of apartments in Block 2 from 26 to 23.

Eden , Blackrock , Cork

275m
2442822CONDITIONAL3 Apr 2024

Permission for development on a site known as City Gate Plaza (former Ma/Comm site), Loughmahon Link Road, Mahon, Cork, which will consist of the provision of 2 no. 4-storey over ground floor office buildings, Block A1 and Block A2, to replace the permitted, not yet constructed, 4 storey over ground floor office building, identified as Block A, permitted under application reg. ref. 18/38036, as extended. Block A1 will have 2 no. terraces at Level 4, and Block A2 will have 1 no. terrace at Level 4. Each block will have a rooftop plant enclosure. The proposed development will also consist of all associated signage, site development, drainage, and landscaping works.

Site known as City Gate Plaza , (former Ma/Comm site) , Loughmahon Link Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?