SonicWALL , International Ltd. , Block C Mahon
CONDITIONALPlanning application 1838141
Cork - Cork City Council
Proposed Development
Permission... for external signage at St. Michael's Dr, Block C, Mahon, City Gate, Cork, T12 HD21.
View the full application file on the council's planning portal →Application Timeline
Application received
23 Nov 2018
Decision: CONDITIONAL
14 Jan 2019
Decision due
28 Jan 2019
Grant issued
25 Feb 2019
Application Details
- Location
- SonicWALL , International Ltd. , Block C Mahon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 23 November 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 January 2019
- Grant Date
- 25 February 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the erection of 1 no. sign to the south elevation (1 no. sign in total) at the existing building Block C, Citygate, Mahon, Cork (previously granted under planning applications 09/34109 and 12/35221).
Existing Building Block C , Citygate Park Development , Ballinure Mahon
For permission at Quest Software, Block C, City Gate Park, Mahon, Cork City for provision of new generator on site, including all associated site works.
Quest Software , Block C , City Gate Park
Permission for development which will consist of the change of use of part of the existing ground floor and the entire first-floor of Block B, City Gate Park, Mahon, Cork from the office use permitted under application register references 09/34109 and 13/35818 to outpatient medical services use, and all associated site development works.
Block B , City Gate Park , City Gate Mahon
Permission for development which will consist of the change of use of the existing second floor and third floor of Block B, City Gate Park, City Gate, Mahon, Cork from the office use permitted under application register reference 09/34109 to outpatient medical services use, and all associated site development works
Block B , City Gate Park , City Gate
Permission... for the erection of 3 no. internally illuminated building signs, externally fixed on floor 2 and all associated site works.
2 Park Place , Block B City Gate , Ballinure
Permission for the installation of 2 no. 1.1m high x 3.46m wide external back lit signs above 1st floor façade on designated signage spandrel panels and replacement of 0.58m high x 3.48m wide window with ventilation louver.
Block B , Park Place , City Gate
Permission for the construction of an extension to existing dwelling house and all associated works and all associated site works
7 St. Michael's Drive , Ballinure , Mahon
Permission for the development of a lengthened vehicle queueing lane and ancillary pedestrian/cycle infrastructure at Mahon Point Shopping Centre, Mahon Link Road, Cork. The proposed development includes a new section of pedestrian and cycle path, amendments to existing pedestrian crossings including the relocation of one no. existing pedestrian crossing, provision of two no. additional uncontrolled pedestrian crossings, additional road markings/signage, relocation of lighting and all associated and ancillary site development works.
Mahon Point Shopping Centre , Mahon Link Road , Cork
Permission for development which will consist of a change of use of part of the existing ground floor of Building 1000, City Gate, Mahon Ring Road and St. Michael's Drive, Mahon, Cork from the office use permitted under application register references 05/30133 and 06/30633 to outpatient medical services use, and all associated site development works.
Building 1000 , City Gate Mahon Ring Road , and St. Michaels Drive
Permission for (A) The demolition of 1 no. existing single storey semi-detached dwelling, 2 no. existing commercial shed units, 1 no. external temporary storage unit and associated concrete base, (B) The construction of a 2 storey apartment block comprising 2 no. 1-bedroom apartments each with their own private balcony/terrace (C) The construction of a 4 storey apartment block to contain 42 no. apartments comprising 19 no. 1 bedroom apartments, 21 no. 2 bedroom (3P) apartments and 2 no. 3 bedroom apartments each with their own private balcony/terrace (D) Construction of revised existing vehicular entrance off Ballinure Cottages with on site circulation roadway and associated car parking area and hard and soft landscaping (E) The construction of an external bike store with roof and secure railing enclosure, a bin storage shed unit, proposed boundary wall and railing to main entrance with masonry walls to remaining boundaries, and all associated site works.
8 and 8A Ballinure Cottages , Mahon , Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?