← Back to search

9 St. Finbarrs Park , Glasheen Road , Cork

CONDITIONAL

Planning application 1938335

Cork - Cork City Council

Proposed Development

Permission for the following alterations to existing dwelling; demolition of existing attached garage to side elevation, construction of two-storey extension to side elevation, single storey extension to rear elevation, porch extension to front elevation, and rooflight to side elevation.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Apr 2019

  2. Decision: CONDITIONAL

    28 May 2019

  3. Decision due

    30 May 2019

  4. Grant issued

    9 Jul 2019

Application Details

Location
9 St. Finbarrs Park , Glasheen Road , Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
5 April 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 May 2019
Grant Date
9 July 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

53m
1838004CONDITIONAL1 Aug 2018

Permission for: A) retention of alterations made to the existing driveway entrance to improve sightlines and vehicle access, B) alterations to the existing bungalow and demolition of two existing one storey extensions to the rear and side of the bungalow, C) construction of 74m2 (total floor space) on one and a half storey extension to the south west facing elevation (side) of the existing bungalow, and all ancillary site works.

'Hove' , Hartlands Road , The Lough

68m
2241195CONDITIONAL21 Jun 2022

Permission is sought for modifications to previously granted application (An Bord Pleanala Reference ABP-310020-21) for the construction of a residential development of 3 no. detached two-storey dwellings at site to rear of No. 18 St. Finbarr's Park, The Lough, Cork City by Waterfront Developments The Lough Ltd. Proposed modifications include increasing the overall area of each of the houses from 218sqm to 263.57 sqm, minor alterations to site entrances at Nos. 18 and 19 St. Finbarr's Park, minor alterations to the locations of the houses on site, alterations to the elevations and house layouts, and alterations to site boundaries, landscaping and all ancillary site works.

Site to rear of , No.18 St. Finbarrs Park , The Lough

68m
1938610REFUSED7 Aug 2019

Permission... for the construction of a residential development of 3 No. detached two-storey-over-basement dwellings, new site entrance onto St. Finbarr's Park, alterations to existing site entrances at Nos.18 and 19 St. Finbarr's Park, modifications to existing site boundary treatments and all ancillary site works at site to rear of No.18 St. Finbarr's Park, The Lough, Cork City.

Site to rear of No.18 St.Finbarr's Park , The Lough , Cork City

68m
2039421REFUSED21 Jul 2020

Permission...for the construction of a residential development of 3 no. detached two-storey dwellings, new site entrance onto St. Finbarr's Park, alterations to existing site entrances at Nos. 18 and 19 St. Finbarr's Park, modifications to existing site boundary treatments and all ancillary site works.

Site to rear of , No.18 St. Finbarrs Park , The Lough

68m
2039328N/A5 Jun 2020

Permission for the construction of a residential development of 3 No detached two storey dwellings new site entrances at Nos 18 and 19 St Finbarrs Park modifications to existing site boundary treatments and all ancillary site works at site to rear of no 18 St Finbarrs Park The Lough Cork City by Waterfront Developments The Lough Ltd.

Site to Rear of no 18 , St Finbarrs Park , The Lough

76m
2341924CONDITIONAL14 Apr 2023

Permission for (A) Demolition of existing rear single-storey extension, (B) Construction of a new single-storey rear extension, (C) Construction of a new extension at first floor level to rear roof, comprising dormer windows, (D) Conversion of the existing attic to habitable space, (E) Alterations to the existing dwelling house layout, (F) Reconfiguration of existing entrance/boundary comprising new pedestrian gate and vehicular entrance, and alterations to driveway, (G) Velux window to front elevation roof, and all associated siteworks at an existing dwelling house.

28 Hartlands Road , Cork

81m
2543805CONDITIONAL14 Apr 2025

Permission is sought for the following works to an existing two-storey dwelling house: the partial demolition of existing ground-floor side walls and pitched roofs, the construction of two-storey side/rear extensions and a single-storey rear extension, the conversion of an existing domestic garage into habitable space, alterations to existing front, side, and rear elevations, and all associated site works.

40 Glendale Grove , Glasheen , Cork

81m
2543808CONDITIONAL14 Apr 2025

Permission is sought for: Demolition works of existing two-storey side extension and existing single-storey rear extension to dwelling and for the construction of a new two-storey side extension with hipped roof extension and rooflight, a new single storey rear extension, new loft conversion with back dormer, new front porch, elevational alterations, internal refurbishment, new external insulation and window upgrades and all associated site works.

46 Saint Finbarrs Park , The Lough , Cork

91m
1837987CONDITIONAL20 Jul 2018

Retention of a structure at: 19 St Finbarr's Park, the Lough, Cork. Retention of 2-storey extension to rear of existing 2 storey dwelling, insertion of windows to north elevation and new garden wall to rear.

19 St Finbarr's Park , The Lough , Cork

100m
2140414N/A6 Aug 2021

Permission to construct a rear two-storey extension and alterations to the south-east elevation, all to existing dwelling.

Carbery House , Hartlands Avenue , Glasheen Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?