← Back to search

"Lucerne" , Hartland's Avenue , Glasheen Road

CONDITIONAL

Planning application 1938381

Cork - Cork City Council

Proposed Development

Permission.... for the construction of an extension, elevational changes, demolitions, internal refurbishments to an existing dwelling, widen existing vehicle entrance, landscaping and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 May 2019

  2. Decision due

    2 Jul 2019

  3. Decision: CONDITIONAL

    2 Jul 2019

  4. Grant issued

    13 Aug 2019

Application Details

Location
"Lucerne" , Hartland's Avenue , Glasheen Road
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
8 May 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 July 2019
Grant Date
13 August 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

42m
2039220CONDITIONAL31 Mar 2020

Permission for demolition of single storey extension to rear, construction of new single storey extension to rear and two-storey extension to side, elevational alterations to front, side and rear and retention of rooflight to front elevation, all to existing dwelling.

24 Saint Finbarr's Park , Glasheen Road , Cork

81m
2442891N/A29 Apr 2024

Planning permission for retention for the subdivision of an existing residential property and the construction of an attached single-storey 1 bedroom residential unit to the side of the existing 2-storey, semi-detached dwelling house, inclusive of the conversion of an existing single-storey side annex, formerly serving the existing dwelling, and the construction of a single-storey rear extension to same; and all ancillary site works. Planning permission is also sought for proposed alterations to the existing site entrance and to the parking and ancillary areas to front of the properties, and all associated site works.

Loughder Hartland's Avenue , Glasheen Road , Cork

108m
1837987CONDITIONAL20 Jul 2018

Retention of a structure at: 19 St Finbarr's Park, the Lough, Cork. Retention of 2-storey extension to rear of existing 2 storey dwelling, insertion of windows to north elevation and new garden wall to rear.

19 St Finbarr's Park , The Lough , Cork

148m
2039421REFUSED21 Jul 2020

Permission...for the construction of a residential development of 3 no. detached two-storey dwellings, new site entrance onto St. Finbarr's Park, alterations to existing site entrances at Nos. 18 and 19 St. Finbarr's Park, modifications to existing site boundary treatments and all ancillary site works.

Site to rear of , No.18 St. Finbarrs Park , The Lough

148m
2039328N/A5 Jun 2020

Permission for the construction of a residential development of 3 No detached two storey dwellings new site entrances at Nos 18 and 19 St Finbarrs Park modifications to existing site boundary treatments and all ancillary site works at site to rear of no 18 St Finbarrs Park The Lough Cork City by Waterfront Developments The Lough Ltd.

Site to Rear of no 18 , St Finbarrs Park , The Lough

148m
1938610REFUSED7 Aug 2019

Permission... for the construction of a residential development of 3 No. detached two-storey-over-basement dwellings, new site entrance onto St. Finbarr's Park, alterations to existing site entrances at Nos.18 and 19 St. Finbarr's Park, modifications to existing site boundary treatments and all ancillary site works at site to rear of No.18 St. Finbarr's Park, The Lough, Cork City.

Site to rear of No.18 St.Finbarr's Park , The Lough , Cork City

148m
2241195CONDITIONAL21 Jun 2022

Permission is sought for modifications to previously granted application (An Bord Pleanala Reference ABP-310020-21) for the construction of a residential development of 3 no. detached two-storey dwellings at site to rear of No. 18 St. Finbarr's Park, The Lough, Cork City by Waterfront Developments The Lough Ltd. Proposed modifications include increasing the overall area of each of the houses from 218sqm to 263.57 sqm, minor alterations to site entrances at Nos. 18 and 19 St. Finbarr's Park, minor alterations to the locations of the houses on site, alterations to the elevations and house layouts, and alterations to site boundaries, landscaping and all ancillary site works.

Site to rear of , No.18 St. Finbarrs Park , The Lough

154m
1737272CONDITIONAL10 Feb 2017

permission is sought for the alteration of the elevations of a detached dwelling house, the construction of a new flat roof at ground floor level, the removal of a chimney stack, the demolition of an existing attached garage structure for the construction of a ground floor bedroom and all associated site works

22 Brookfield Park , The Lough , Cork

156m
2240943CONDITIONAL16 Mar 2022

Permission for demolition of an extension to the rear of an existing house, construction of new single storey extensions to the side and rear including conversion of existing garage, alterations to existing elevations, conversion of attic space with roof light to rear, and all associated site works.

27 Brookfield Park , The Lough , Cork

156m
2241676CONDITIONAL22 Dec 2022

Permission for demolition of an extension to the rear of an existing house, construction of new two-storey extension to the rear, single-storey extension to the side including conversion of existing garage, alterations to existing elevations, conversion of attic space with roof light to rear, and all associated site works.

27 Brookfield Park , The Lough , Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?