Proposed Development
A solar farm consisting of circa 178,600 m2 of solar panels on ground mounted frames, 1 no. single storey 38 kV substation and associated electrical compound with loop in to existing 38kV overhead line on site via 2 no. new timber polesets, 12 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, landscaping and all associated ancillary development works. Construction and operational access will be via an existing entrance from the L-2462. The proposal will be connected to the national grid via the loop-in to existing overhead wires that traverse the site. The operational lifespan of the solar farm will be 35 years.
Application Timeline
Application received
29 May 2019
Decision: CONDITIONAL
22 Jul 2019
Decision due
23 Jul 2019
Appeal submitted
19 Aug 2019
Appeal decided: CONDITIONAL
28 Nov 2019
Application Details
- Location
- Ballinvuskig , Douglas , Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 29 May 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 July 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development at a c. 44.4 ha site at Ballinvuskig, Douglas, Co. Cork. The development will consist of modifications to the permitted solar farm (Pl. Ref. No: 19/5371, ABP Ref. PL04.305186). The proposed modifications are entirely within the boundary of the permitted development and will consist of: (I) The exclusion of the permitted 38kV substation and grid connection which comprised of a loop in to the existing 38kV overhead line on site; (II) The exclusion of the permitted battery storage unit and container unit; (III) A reduction in number of inverter/transformer stations from 12 no. permitted to 8 no. inverter/transformer stations; (IV) The provision of a ring main unit to facilitate the connection of Ballinvuskig solar farm to a proposed 110kV substation at Ballinrea Co. Cork; (V) Assorted changes to the internal access tracks and the layout and dimensions of their permitted photovoltaic panels which will increase the solar photovoltaic footprint from c. 178,600 sq.m of ground mounted solar panels to c. 188,000 sq.m of ground mounted solar panels; and (VI) All associated site works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and the NIS will be submitted to the planning authority with the application.
Ballinvuskig , Douglas , Co.Cork
A new vehicular entrance and new vehicular access to serve an existing dwelling (change of layout to that permitted under Planning Reg. No. 18/06369) and all associated site works
Fortwilliam , Ballinvuskig , Douglas
The construction of a new vehicular entrance to an existing dwellinghouse, and all associated site works.
Ballinvuskig , Douglas , Co. Cork
Dwellinghouse
Kilnahone Ballygarvan
Bungalow
Kilnahone Ballygarvan
Permission to construct a 2-storey dwelling a new vehicular entrance a new wastewater treatment system and all associated site works.
Fortwilliam , Ballinvuskig , Douglas
Permission... for the construction of a new two storey office building together with ancillary refuse store and plant area, car parking area, proprietary wastewater treatment biocycle unit, percolation area and storm water retention tank as well as all associated signage and ancillary site works.
Curraghconway South , Douglas , Co.Cork
Permission to construct a dwelling house and garage with related site works.
Ballinvuskig , Douglas , Co.Cork
For permission to construct a dwelling house and garage with related site works.
Ballinvuskig , Douglas , Cork
Permission to construct a new dwelling house at Ballinvuskig Douglas Cork for Valerie Browne and Damien O Dowd.
Ballinvuskig , Douglas , Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.