← Back to search

Kerry Road , Coolflugh , Tower

CONDITIONAL

Planning application 2039202

Cork - Cork City Council

Proposed Development

Permission for the construction of a residential development of 37 no. dwelling houses and all ancillary site development works at Kerry Road, Coolflugh, Tower, Cork. The proposed development consists of the construction of 4 no. 4 bedroom semi-detached dwelling houses, 32 no. 3 bedroom townhouses and 1 no. 2 bedroom bungalow. Access to the proposed development will be provided via a new vehicular entrance from the Kerry Road (L-2752).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Mar 2020

  2. Decision due

    7 Apr 2021

  3. Decision: CONDITIONAL

    7 Apr 2021

  4. Grant issued

    19 May 2021

Application Details

Location
Kerry Road , Coolflugh , Tower
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
25 March 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 April 2021
Grant Date
19 May 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

124m
2039358CONDITIONAL23 Jun 2020

Permission...for the construction of a new extension to the rear of the existing dwelling, construction of a new front porch to the existing dwelling, demolition of existing shed and ancillary site works.

Kerry Road , Tower , Blarney

125m
195392REFUSED29 May 2019

Construction of extension to the rear of the existing dwelling, Construction of front porch to the existing dwelling, demolition of existing shed and ancillary site works

Coolflugh , Kerry Road , Tower

163m
194970CONDITIONAL17 Apr 2019

To construct a single storey granny flat extension to the side of our existing dwelling with all associated elevational alterations and all associated ancillary site development works

1 Dromcarra , Coolflugh Tower Blarney , Co Cork

167m
2140297CONDITIONAL21 Jun 2021

Permission for the construction of a two storey extension to rear of existing dwelling house, removal of existing pitched roof to single storey extension to side and replacement with a flat roof, new porch to front, two new first floor windows to side elevation and all ancillary site works.

Halrio , Kerry Road , Coolflugh Tower

196m
2342113CONDITIONAL28 Jun 2023

Permission for retention for the as-built garage and for the provision of the roof windows to the dwelling house.

48 Seanacloc , Tower , Blarney

218m
2039573CONDITIONAL2 Oct 2020

Permission for external alterations to existing dwelling including 3 no. new roof lights, enlarging 3 no. windows to south and north elevations to become level access door openings, three new windows and reduction in size of existing window to east elevation, new main entrance door on west elevation and new side door on north elevation with existing side door on west elevation to become a window, enlargement of patio area to the south, new patio area to the north, including addition of timber louvre wall screens, and all associated site works.

Cuil Na Greine , Kerry Road , Tower

235m
2442591CONDITIONAL8 Jan 2024

Permission to construct a 2nd storey side extension above existing ground floor, and convert existing garage to bedroom, including elevational alterations and all associated site works.

13 Laureston Crescent , Tower , Blarney

235m
2342493N/A30 Nov 2023

Permission to construct a two-storey side extension and convert existing garage to bedroom, including elevational alterations and all associated site works.

13 Laureston Crescent , Tower , Blarney

235m
2039465CONDITIONAL10 Aug 2020

Permission for alterations to the front elevation of an existing dwelling house including the removal of the 2 no. existing bay windows and the associated lean-to roof and for the construction of a single storey porch and 1 no. bay window, new ground floor window and to fully render the front façade. The proposal also includes for all the necessary and ancillary site works to complete the development.

67 Seanacloc , Tower , Blarney

238m
2241584CONDITIONAL25 Nov 2022

Permission for the construction of a new one storey extension to the southern and western side of the existing house, proposed new shed dormer window in existing attic over the existing stairs at the western side of the existing house with new skylight, proposed canopy roof over the existing entrance, proposed skylights on western and eastern side of existing roof, internal alterations in existing house, new windows and doors to the external elevations, formation of new vehicular entrance to the site with new gates at the south-east side of the site and all associated site works.

6 Droumcarra , Tower , Blarney

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?