Proposed Development
Permission for alterations and extensions to dwelling house consisting of a single storey extension to the front and side, a two storey rear extension incorporating the re-roofing of existing flat roofed two storey element, elevational changes and all associated site works and services.
Application Timeline
Application received
5 Aug 2020
Decision due
19 Nov 2020
Decision: CONDITIONAL
19 Nov 2020
Grant issued
31 Dec 2020
Application Details
- Location
- Auburn Lodge , Waterloo , Blarney
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
- Site Area
- 0.183 ha
Timeline
- Registration Date
- 5 August 2020Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 November 2020
- Grant Date
- 31 December 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for alterations to dwelling house consisting of a single storey extension to the front and side , a 2 storey rear extension, elevational changes and associated site works and services at Auburn Lodge, Waterloo, Blarney, Cork.
Auburn Lodge , Waterloo , Blarney
Retention of rear annex extension and permission for alterations to dwellinghouse consisting of a first floor extension, elevational changes, raising roof in rear annex to incorporate a new pitched roof along with associated site works and services
Auburn Lodge , Ballygibbon , Waterloo
Retention of the conversion of attic for use as part of the dwelling and 4 no. velux rooflights and permission for alterations comprising the construction of windows to the rear and side elevations of dwelling and the construction of an entrance porch to the front elevation and associated site works
Ballygibbon , Waterloo , Co. Cork
The construction of a detached, dormer bungalow type, dwelling with proprietary treatment unit and percolation area and associated site works.
Ballygibbon , Waterloo , Blarney
Construction of approximately 800m length of concrete footpath, and ancillary works, as follows: 1) along the Waterloo Road between the end of the River Martin Walkway and the Waterloo Inn; and 2) completion of the existing footpath along the Garrycloyne Road between Putlands Bridge and Knocknasuff Road.
Waterloo Road and Garrycloyne Road , Blarney , Co.Cork
Construction of approximately 800m length of concrete footpath, and ancillary works, as follows: 1) along the Waterloo Road between the end of the River Martin Walkway and the Waterloo Inn; and 2) completion of the existing footpath along the Garrycloyne Road between Putlands Bridge and Knocknasuff Road.
Waterloo Road and Garrycloyne Road , Blarney , Co.Cork
Construction of approximately 800m length of concrete footpath, and ancillary works, as follows: 1) along the Waterloo Road between the end of the River Martin Walkway and the Waterloo Inn; and 2) completion of the existing footpath along the Garrycloyne Road between Putlands Bridge and Knocknasuff Road.
Waterloo Road and Garrycloyne Road , Blarney , Co.Cork
To construct a new dwelling house.
Knocknasuff Waterloo Blarney Co. Cork
To decommission existing septic tank and percolation area serving existing dwelling house and install a new wastewater treatment unit and polishing filter.
Knocknasuff Waterloo Blarney Co. Cork
Installation of septic tank to accommodate new w.c kiosk at stables compound
Ballygibbon Waterloo Blarney
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?