← Back to search

No.6 Willison Avenue , Boolypatrick , Blarney

CONDITIONAL

Planning application 2039666

Cork - Cork City Council

Proposed Development

Permission for

  1. (1)
    Construction of a two storey extension to the rear of the existing dwelling.
  2. (2)
    Construction of a single storey porch to the front.
  3. (3)
    Alterations to all elevations, to include modifications to existing dormer windows to the front elevation, new rooflight to the front elevation and new dormer window to the rear elevation, and all associated site works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Nov 2020

  2. Decision due

    26 Apr 2021

  3. Decision: CONDITIONAL

    26 Apr 2021

  4. Grant issued

    7 Jun 2021

Application Details

Location
No.6 Willison Avenue , Boolypatrick , Blarney
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
13 November 2020Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 April 2021
Grant Date
7 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

117m
1938570CONDITIONAL24 Jul 2019

Permission for retention is sought for the conversion of the original car port into a bedroom and permission for retention is sought for the construction of the sunroom to the rear of the dwelling at No. 1 Willison Grove, Blarney, Cork by Jennifer Peterson

1 Willison Grove , Blarney

340m
2342158CONDITIONAL13 Jul 2023

Retention planning permission is sought for the retention of the pitched roof to the single-storey front annex, for the retention of the single-storey extension to the rear of the dwelling, for the retention of the dormer construction to the attic at the front and rear of the dwelling, for the retention of the conversion of part of the attic for use as part of the dwelling, for the retention of the window to the side of the dwelling and for the retention of the conversion of the garage for use as part of the dwelling.

No. 4 Shournagh Drive , Blarney , Co. Cork

353m
177184CONDITIONAL6 Dec 2017

Alterations to the existing dwelling, construction of a single storey extension to the side and rear of the existing dwelling and all associated site works.

1 Willison Lawn , Boolypatrick Blarney , Co. Cork

571m
2241082CONDITIONAL10 May 2022

Permission is sought for the development of ground-mounted photovoltaic solar panels with a maximum actual square meterage of 486m2 distributed over a grass area on-site with associated ancillary works.

Blarney Waste Water , Treatment Plant , Riverview Estate Tower

585m
2342135N/A6 Jul 2023

(A) Permission for the demolition of an existing cottage and for the construction of a new dormer style dwelling with connection to mains sewer and all associated site development works. (B) Permission for retention is also sought for widening of existing vehicular entrance and front boundary wall as constructed.

Garland , St. Ann's Hill , Tower

628m
2443154CONDITIONAL2 Aug 2024

Permission for the following works at existing sessional childcare facility at Ballyneety, Shournagh Road, Boolypatrick, Blarney, Cork, T23TY75: (1) Removal of existing utility shed attached to existing store-and-half stand-alone building (used as sessional pre-school service at ground floor level), (2) Construction of new storey-and half extension to same, to comprise new stairwell to access the existing first-floor, currently used as storage space, and to be converted into staff quarters, and construction of new laundry room at ground floor level; (3) Removal of existing container located to the north west of the site; (4) Construction of new ancillary single-storey storage shed; (5) All associated site works.

Ballyneety , Shournagh Road , Boolypatrick

640m
2140265CONDITIONAL9 Jun 2021

Permission to construct new extensions and for alterations to existing dwelling house, proposed works to include (1) To demolish part of existing dwelling house, floor area =68.13sq.m (2) To demolish 1 no. existing chimney stack, (3) To construct new single-storey extensions to north-east and south-west facing elevations with a total proposed floor area of 85.21 sq.m (4) Minor alterations to existing elevations and (5) All associated site works, to include provision of new external pedestrian access ramp to serve dwelling.

Boolypatrick , Blarney , Cork

679m
187111CONDITIONAL29 Nov 2018

Construction of a nursing home, 29 no. detached houses and all ancillary site works on the site of the former St. Ann’s Hydropathic Establishment. The proposed development makes provision for the partial demolition, conservation, refurbishment, alteration and change of use of the remains of the former St. Ann’s Hydropathic Establishment which is a Protected Structure (RPS 00815) to facilitate its integration into the proposed 2-storey nursing home which will provide for 120 no. bed spaces and ancillary offices, meeting rooms, staff facilities, kitchen/restaurant, nurse stations, morgue, laundry facilities, communal lounge and the refurbishment of the former belfry tower structure. The proposed development will also include 29 no. detached houses consisting houses consisting of 26 no. single storey 3-bedroom detached houses and 3 no. 2-storey, 4- bedroom detached houses. Access to the proposed development will be via a new entrance and access road from the R617 and ancillary site works will include provision of surface parking associated with the proposed nursing home, pedestrian walkways and landscaping.

St. Ann's Hill , Kilnamucky , Tower Blarney

679m
186697N/A12 Oct 2018

The construction of a nursing home and residential development 29 no. detached houses and all ancillary site works on the site of the former St. Ann’s Hydropathic Establishment. The proposed development makes provision for the partial demolition, conservation, refurbishment, alteration and change of use of the remains of the former St. Ann’s Hydropathic Establishment which is a Protected Structure (RPS 00815) to facilitate its integration into the proposed 2-storey nursing home which will provide for 120 no. bed spaces and ancillary offices, meeting rooms, staff facilities, kitchen/restaurant, nurse stations, morgue, laundry facilities, communal lounge and the refurbishment of the former belfry tower structure. The proposed development will also include 29 no. detached houses consisting of 26 no. single storey 3-bedroom detached houses and 3 no. 2-storey, 4-bedroom detached houses. Access to the proposed development will be via a new entrance and access road from the R617 and ancillary site works will include provision of surface parking associated with the proposed nursing home, pedestrian walkways and landscaping.

Site of the former St. Ann's Hydropathic Est. , St. Ann's Hill , Kilnamucky

781m
2140128CONDITIONAL26 Apr 2021

Permission for the construction of a single storey dwelling and all associated development site works at St. Ann's Hill, Kilnamucky, Tower, Blarney, Cork. The proposed development will be accessed via an existing private laneway.

St. Anns Hill , Kilnamucky , Tower

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?