← Back to search

133 Evergreen Road , Cork

CONDITIONAL

Planning application 2140250

Cork - Cork City Council

Proposed Development

Permission for the demolition of an existing single storey mid-terrace dwelling and the construction of a replacement two-storey, three-bedroom, mid-terrace dwelling with roof light, along with all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jun 2021

  2. Decision due

    27 Jul 2021

  3. Decision: CONDITIONAL

    27 Jul 2021

  4. Grant issued

    7 Sept 2021

Application Details

Location
133 Evergreen Road , Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council
Site Area
0.008 ha

Timeline

Registration Date
2 June 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 July 2021
Grant Date
7 September 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
1837879CONDITIONAL4 May 2018

Permission for change of use of ground floor of building at 134 Evergreen Street, from use as a Doctors Surgery as permitted by TP11,640 to Residential use.

134 Evergreen Road , Cork

12m
1838177CONDITIONAL18 Dec 2018

For permission at No.2 Sunville, Evergreen Road, Turner's Cross, Cork. The development will consist of internal works to refurbish the existing vacant commercial unit for the re-establishment of the former restaurant use, with customer seating and including the sale of hot food for consumption off the premises, the replacement of existing signage and all associated site development works.

No.2 Sunville , Evergreen Road , Turner's Cross

54m
2039427CONDITIONAL27 Jul 2020

Permission for extensions and change of use of former Public House and existing dwelling at no.35 to residential use, to provide 5 no dwellings & 2 No apartments the proposals will include 1) Elevational changes to existing buildings 2) Partial demolition of existing rear single storey building ( Existing Rear Function Room Areas/Toilets) 3) New Flat roof structure to new Dwellings 16 and 17 4) New single storey Flat Roof Extensions to rear of existing house 35/new house no.31 & Elevational Changes 5. New External Stairs serving new Duplex Apartment No. 34B 6) Modifications to internal floor plans to accommodate new domestic units within existing structures 7) New External Bin Store 8) New access Laneway serving dwellings & apartments 9) All associated site development works

31/35 Evergreen Road , Turner's Cross

54m
2039275N/A8 May 2020

Permission for extensions and change of use of former Public House and existing dwelling to residential use to provide 4 no dwellings and 2 no apartment. The proposal will include 1 Elevation changes to existing buildings. 2 Partial Demolition of existing rear single storey building Existing rear function room area and toilets. 3 New Flat roof structure to new dwellings 16 and 17. 4 New single storey flat roof extensions to rear of existing house 35 new house no 31 and elevation changes. 5 New External Stairs serving new Duplex Apartment no 34B. 6 Modifications to internal floor plans to accommodate new domestic units within existing structures. 7 New External Bin Store. 8 New access Laneway serving dwellings & apartments. 9 All associated site development works at no 31 32 33 34 and 35 Evergreen Road Murphys Gardens Turners Cross Cork.

31 32 33 34 35 , Evergreen Road , Turners Cross

55m
2341829CONDITIONAL9 Mar 2023

Permission for the demolition of the existing rear extension, the change of use and internal/external alterations of the public house to facilitate a residential development consisting of 9 no. dwelling units comprising 3 no. 1 bed dwelling houses, 4 no. 2 bed dwelling houses, 1 no. 1 bed duplex unit and 1 no. 3 bed duplex unit and all associated site development works including private amenity areas (including the provision of private amenity space serving no.s 31 and 35 Evergreen Road), car and bicycle parking with vehicular and pedestrian access via Murphys Gardens.

The Evergreen Bar , 32-34 Evergreen Road , Turners Cross

92m
2342216CONDITIONAL8 Aug 2023

Permission for the development will consist of a free standing single storey ESB Sub-Station and MV switch room (approx. 64m²) to the side boundary of the site, (North-West side) and all associated site works.

Bus Eireann , Capwell Garage , Summerhill South

93m
1737277CONDITIONAL13 Feb 2017

permission for the demolition of the single storey rear extension, erection of a new single storey rear extension, increase in size of the existing front, (first floor), dormer window and the construction of a two storey rear extension, to their dwelling-house

26 , Evergreen Road

97m
2140040CONDITIONAL29 Mar 2021

Permission for proposed alterations to existing dwelling house, to include the construction of new ground and first floor extension to rear, and all associated ancillary site works

9 Congress Road , Turners Road , Cork

98m
2241120N/A24 May 2022

Permission is sought for the demolition of the existing shed and the construction of an infill two-storey, one-bedroom duplex apartment to the rear/side of the existing house and a new pedestrian entrance on Evergreen Road. The property is a Protected Structure number PS 694 and NIAH no. 20505774.

1 Morningside , Summerhill South , Cork City

98m
2140657N/A16 Nov 2021

Permission is sought for the construction of (1) A detached two-storey, one-bedroom duplex apartment to rear/side of the existing house and a new pedestrian entrance on Evergreen Road, (2) An external access door and external stairs , linking access from the second floor to the existing first-floor external staircase of the second floor to the existing first-floor external staircase of the dwelling and all ancillary site works. The property is a protected structure PS694 and on the NIAH no. 20505774.

1 Morningside , Summer Hill South , Cork City

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?