← Back to search

Hollymount Industrial Estate , Blarney Road , Cork

CONDITIONAL

Planning application 2140354

Cork - Cork City Council

Proposed Development

Permission for development to consist of 1010m2 (543 No) of roof mounted Solar PV panels and all associated works across 2 roofs

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jul 2021

  2. Decision due

    7 Sept 2021

  3. Decision: CONDITIONAL

    7 Sept 2021

  4. Grant issued

    19 Oct 2021

Application Details

Location
Hollymount Industrial Estate , Blarney Road , Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
14 July 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 September 2021
Grant Date
19 October 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

51m
2442615REFUSED22 Jan 2024

Permission is sought for: (1) An increase in the permitted tonnage of end-of-life tyres from 2500 tonnes per annum (permitted under planning reference 11/34954) to 7000 tonnes per annum; (2) Installation of a proposed Petrol Interceptor at Hollymount Industrial Estate, Hollyhill, Cork. Retention permission is also sought for an external three-sided storage bunker for the temporary storage of tyres prior to transporting off site at Hollymount Industrial Estate, Hollyhill, Cork, This application relates to an activity requiring a waste permit at Hollymount Industrial Estate, Hollyhill, Cork.

Hollymount Industrial Estate , Hollyhill , Cork City

106m
2342288CONDITIONAL7 Sept 2023

Permission for the demolition of part of an existing warehousing building and the construction of a new extension to the warehousing building including a cantilever canopy, waste enclosure with a roof level generator within a plant enclosure and all associated site development works at the Hollymount Industrial Estate, Hollyhill, Cork. The proposed use of new extension includes warehouse space and a central food processing unit with staff facilities and office space at mezzanine level. The proposed site development works include the construction of a new substation building, new vehicular gate providing access to all both occupiers of the site and a new pedestrian access from Harbour View Road. The development comprises of an activity which requires a Waste Permit under the Waste Management Act 1996 (as amended).

Hollymount Industrial Estate , Hollyhill , Cork

108m
1737454CONDITIONAL2 Jun 2017

permission is sought by Eamon Long and Company T/A Earthmoving Wear Parts Ltd. for (a) subdivision of existing Industrial Unit into three smaller Industrial Units, (b) alterations to elevations associated with the above subdivision including removal of false front façade and recladding of original façade, (c) additional vehicular entrance to west boundary corner, (d) signage to front elevation, all to existing detached industrial unit

industrial Unit at Hollymount Industrial Estate , Hollyhill , Cork

146m
2241412CONDITIONAL19 Sept 2022

Permission to install rooftop photovoltaic solar panel arrays consisting of approximately 1,759 sqm of photovoltaic solar panels and associated fall arrest systems fixed to the existing roof slopes of existing buildings.

Units 5 and 6 , Clogheen Business Park , Blarney Road

150m
2342555CONDITIONAL19 Dec 2023

Permission to (1) Demolish an existing single-storey storage building (34 sqm) to western side of existing warehouse and 2 no. internal first-floor storage mezzanines (194 sqm), (2) Remove existing office portacabin (58 sqm), (3) Construct a two-storey extension (293 sqm) to existing warehouse to house offices and staff facilities associated with the existing kitchen and furniture manufacturing operations, (4) Construct an extension (374 sqm) to eastern side of existing warehouse to create additional storage area to warehouse, (5) Install a first-floor window to west elevation of existing warehouse and (6) Carry out all associated site works.

Units 5 and 6 , Clogheen Business Park , Blarney Road

209m
2341790CONDITIONAL17 Feb 2023

Permission for modifications to and the expansion of the existing plant compound permitted by Ref. No. 21/39966 and all associated site development works at Hollymount 2, Hollymount Industrial Estate, Hollyhill, Cork. The proposed works consist of: (1) The construction of an expanded plant compound and the installation of (A) Condenser units, (B) 1 no. air handling unit, (C) 3 no. dry air coolers, and (D) The construction of 2 no. pump enclosures. Permission is also sought for the retention of modifications to the existing plant compound permitted by Ref. No. 21/39966 comprising of an increase in the area of the plant compound and the provision of 2 no. pump enclosures within the compound.

Hollymount 2 , Hollymount Industrial Estate , Hollyhill

213m
2139966CONDITIONAL2 Mar 2021

Permission for modifications to the existing warehouse building and all ancillary site development works at the Former Banta site, Hollymount Industrial Estate, Hollyhill, Cork. The proposed development consists of a change of use of part of the existing warehouse building to use as a testing and measurement facility with ancillary office use and modifications to the building consisting of: the construction of a new mezzanine floor; and modifications to the façade including (1) New windows at first floor level, relocation of doors and opening; and (2) The installation of extract fans and associated ducts. The proposed site development works include: (a) The removal of 1 no. existing shelter; (b) The relocation of an existing generator; (c) Installation of a bicycle rack; (d) The construction of an external plant enclosure comprising of a back up generator with associated diesel tank, air chiller with associated circulation pumps, 2 no. air handling units, 4 no. external condenser units and gas storage tanks; and (e) An external plant enclosure comprising of an air handling unit.

The Former Banta Site , Hollymount Industrial Estate , Hollyhill

215m
2139877CONDITIONAL2 Feb 2021

Permission is sought for the erection of 1. Lean-to and Roof Mounted Solar Panels to the South East Elevation of Existing Unit and associated service gantry. 2. New deck with perimeter railing to accommodate Geodome satellite receivers to Existing Roof of Existing Unit and associated site works.

Unit 8 , Hollyhill Industrial Estate , Hollyhill

215m
2443320N/A15 Oct 2024

permission for 1) the erection of two roof mounted insulated chimneys 2)two diesel storage tanks each with a capacity of 10000 litres 3)two water storage tanks each with the capacity of 10000 litres 4) one bund area consisting of a total capacity of 11000 litres. additionally permission is sought for the retention of 1) external plant room 2) a low height wall with fencing a service footpath and electrical and data groundworks on the northwest elevation 3) roof mounted solar panels on the southeast elevation 4) four roof mounted air inlet vents and minor alterations to the fenestration on the northeast elevation

Unit 8 , Hollyhill Industrial Estate , Hollyhill

226m
2140555CONDITIONAL8 Oct 2021

Permission on a site located at Mile Stream, Shanakiel, Cork City. Planning permission is sought for the following, (1) Minor amendments to house typologies previously permitted under planning ref: 16/37010. The amendments will include minor internal layout alterations and elevational modifications including adjustments to ridge heights, removal of dormer windows, removal of chimneys and provision of rooflights. (2) All ancillary site works and landscaping necessary to complete the development.

Mile Stream , Shanakiel , Cork City

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?