← Back to search

Altona , Kerry Pike , Carrigrohane

CONDITIONAL

Planning application 2140476

Cork - Cork City Council

Proposed Development

Permission for retention of (1) Existing porch extension, (2) Existing rear single storey extension, (3) Construction of domestic garage and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Sept 2021

  2. Decision due

    9 Dec 2021

  3. Decision: CONDITIONAL

    9 Dec 2021

  4. Grant issued

    31 Jan 2022

Application Details

Location
Altona , Kerry Pike , Carrigrohane
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork City Council

Timeline

Registration Date
6 September 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 December 2021
Grant Date
31 January 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

27m
2140750CONDITIONAL20 Dec 2021

Permission to construct a 2 storey dwelling with a new site entrance and a site specific treatment unit and all other associated site works.

Kerry Pike , Carrigrohane , Cork City

301m
2443378CONDITIONAL5 Nov 2024

Permission to retain a site specific treatment unit and percolation area that replaces an old septic tank and percolation area

Kerry Pike , Coolymurraghue , Cork City

311m
187417CONDITIONAL21 Dec 2018

Construction of 20 no. dwelling houses (changes and amendments to part of the development approved originally under Planning Reg. Nos. 92/291 and 92/292) consisting of changes to the site layout, house types and levels for house nos. 105-119 and 123-127 as follows: 1. Amendments to house locations and house levels; 2. Amendments to the location and levels of roads; 3: Amendments to the design of House Types H, H1, J & J1, including plan and elevational changes; 4. All associated site development works.

Clonlara , Coolymurraghue , Kerrypike

322m
2442788CONDITIONAL22 Mar 2024

Permission for the construction of a horticultural shed (change of design to that permitted per reg. ref. 22/41372) and all associated works.

Healys Bridge , Carrigrohanebeg , Carrigrohane

322m
2241372CONDITIONAL5 Sept 2022

Permission for retention of alterations to existing site entrance and (2) Permission for the construction of a horticultural shed and all associated works.

Healys Bridge , Carrigrohanebeg , Carrigrohane

327m
2241021CONDITIONAL14 Apr 2022

Permission to construct a single storey dwelling , create two new vehicle entrances at existing entrance location, site specific treatment unit and associated works.

Kerry Pike , Coolymurraghue , Cork City

329m
2543753CONDITIONAL28 Mar 2025

Permission for the construction of 4 no. apartments. Development involves a change of plan from that permitted by Ref. No. 22/40915, consisting of 4 no. 1 bed apartments replacing 2 no. 3 bed semi-detached houses (previously labelled houses 15 and 16) and all ancillary site development works.

Ballycannon , Kerrypike , Cork

366m
2443257CONDITIONAL16 Sept 2024

Permission for retention is sought for as-existing extensions, alterations and associated works to the detached dwelling. Permission is sought for new development consisting of alterations including 3 no. dormer windows to the rear, together with all ancillary development works.

Ashford , Healys Bridge , Carrigrohane

372m
175703CONDITIONAL4 Jul 2017

To construct a dwellinghouse

Coolymurraghue , Kerry Pike , Co.Cork

372m
184165CONDITIONAL23 Jan 2018

The demolition of an existing derelict building (former shop) and construction of a garage with upper storey office/playroom and bathroom and new boundary wall and gates

Healy's Bridge , Carrigrohanebeg , Carrigrohane

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?