← Back to search

Heather House , St. Marys Campus , Gurranabraher

CONDITIONAL

Planning application 2140698

Cork - Cork City Council

Proposed Development

For retention permission and permission for development of this site at Heather House, St. Mary's Campus, Gurranabraher, Cork. The development consists of: The retention and completion of the existing extension to the Heather House Community Nursing Unit at Heather House, St. Mary's Campus, Gurranabraher, Cork which consists of internal works to the existing structure, car parking and landscaping.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Dec 2021

  2. Decision due

    25 Aug 2022

  3. Decision: CONDITIONAL

    25 Aug 2022

  4. Grant issued

    6 Oct 2022

Application Details

Location
Heather House , St. Marys Campus , Gurranabraher
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork City Council
Site Area
1.95 ha

Timeline

Registration Date
1 December 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 August 2022
Grant Date
6 October 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

69m
2342090CONDITIONAL16 Jun 2023

Permission is sought by the Health Service Executive for the construction of a day room and link corridor extension at ground level (95.5sqm) and retention of 2 no. walled bin enclosures (27.5sqm + 26.0sqm) to the Heather House Community Nursing Unit at Heather House, St. Mary's Campus, Gurranabraher, Cork. The works will include internal modifications to the existing building and ancillary site works and landscaping.

Heather House , St. Marys Campus , Gurranabraher

102m
2140479CONDITIONAL7 Sept 2021

Permission for the construction of an extension to ground and first floor at rear of existing administration building, comprising of new entrance and lift core with connections into the existing building at both ground and first floor level together with all associated site development works.

St. Mary's Health Campus , Bakers Road , Gurranebraher

129m
1837972CONDITIONAL11 Jul 2018

Permission is sought for the demolition of section of existing boundary wall, construction of new gated opening in boundary wall, construction of new footpath connecting Primary Care Centre to Heather House, construction of new footpath connecting Heather House to public footpath on Harbour View Road, construction of new fence and gates, ancillary site works and all associated external works.

St. Mary's Health Campus , Gurranabraher , Cork

139m
2039733CONDITIONAL8 Dec 2020

Permission for change of use of an open green area to a horticultural site for training purposes and to erect perimeter fence and horticultural related structures.

St. Marys Health Campus , Bakers Road , Gurranabraher

307m
2039618CONDITIONAL20 Oct 2020

Permission for the construction of a single-storey extension to the front elevation, including alteration to the existing porch, side and rear elevations. The works will also introduce new openings to the existing elevations, alterations to the front entrance to allow vehicular access, installation of a new access gate and all associated site works.

80 Bakers Road , Gurranabraher , Cork City

307m
2039393REFUSED10 Jul 2020

Permission for the construction of a single-storey extension at the front elevation of the existing dwelling house. The works will include new openings to the existing elevations, alterations to the front entrance to allow vehicular access, installation of a new access gate, boundary walls and all associated site works.

80 Bakers Road , Gurranabraher , Cork City

360m
1837967CONDITIONAL6 Jul 2018

Permission is sought for proposed alterations for existing dwelling house and proposed one storey extensions to rear and side of the house.

8 Monastery Avenue , Blarney Street , Co. Cork

418m
2341747CONDITIONAL1 Feb 2023

Retention is sought for a single-storey extension to the rear of the dwelling.

4 Hollyhill Lane , Blarney Street , Cork

469m
1938706CONDITIONAL18 Sept 2019

Permission for the demolition of an existing garage/shed structure and the construction of 16 no. residential units at the site with frontage with Strawberry Hill and Blarney Street, Cork. The proposed development consists of the construction of 2 no. 3 bedroom semi detached dwelling houses, 8 no. 2 bedroom apartment/duplex units and 6 no. 1 bedroom apartment units and all ancillary site development works including bicycle parking facilities, landscaping and servicing proposals. Vehicular access to the proposed development will be provided via a new entrance from Strawberry Hill.

The site with frontage , with Strawberry Hill and , Blarney Street

477m
1938944CONDITIONAL9 Dec 2019

Permission...for the construction of a 2 storey detached dwelling (2 bedrooms), new pedestrian entrance and all associated site works.

10 Presentation Road , Gurranabraher , Cork City

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?