Permission is sought for the construction of a new two-storey dwelling house, a new site entrance, a new detached domestic garage, a new bio-cycle waste water treatment system and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Jan 2022

  2. Decision due

    25 May 2022

  3. Decision: CONDITIONAL

    25 May 2022

  4. Grant issued

    6 Jul 2022

Application Details

Location
No.6 Carriglen , Ballincolly , Dublin Pike
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
25 January 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 May 2022
Grant Date
6 July 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2442950CONDITIONAL23 May 2024

Permission for change of house type and detached garage as previously granted under Planning Ref. no. 22-40822 and all associated ancillary site development works.

Site No. 6 , Carrig Glen , Ballincolly

51m
2342528CONDITIONAL11 Dec 2023

Permission for retention of detached domestic garage.

No. 7 Carrig Glen , Ballincolly , Dublin Pike

75m
2140610CONDITIONAL1 Nov 2021

Permission for construction of dwelling house, sewerage treatment system, vehicular entrance and all associated site works.

Carrig Court , Ballincolliy , Dublin Pike

99m
2140333REFUSED2 Jul 2021

Permission for the following : (a) To construct a single storey Granny flat, to demolish existing garage, decommissioning of existing septic tank to be replaced by new secondary waste water treatment plant & Premier Tech Ecoflo Tertiary Filter, remove palm trees at existing entrance and reduce height of existing stone wall if required to improve existing sightlines, sub divide overall site with new 2.0m high wall. (b) To construct a new two storey dwelling with a new secondary wastewater treatment plant & Premier Tech Ecoflo Tertiary Filter and a new vehicular entrance off the estate road and all associated ancillary site development works.

No 4 Carrig Court , Dublin Pike , Ballincolly

104m
2443248REFUSED10 Sept 2024

Permission to construct a two-storey dwelling house with a detached double garage on site incorporating the installation of renewable energy measures, a proposed wastewater treatment system and percolation area, extend existing hammerhead to accommodate a new vehicular entrance, proposed pillars to match existing, and (B) Permission fir retention of a post and wire fence to the front of my site together with all associated site works.

Carriglen , Ballincollie , Dublin Pike

104m
2241508REFUSED26 Oct 2022

Permission to construct a two-storey dwelling house with a detached double garage on site incorporating the installation of renewable energy measurers, a proposed wastewater treatment system and percolation area, proposed extended existing hammer head to accommodate a new vehicular entrance, proposed pillars to match existing, a new boundary fence together with all associated site works.

Carriglen , Ballincollie , Dublin Pike

105m
2342529REFUSED12 Dec 2023

For (A) Permission to construct a two-storey dwelling house with a detached double garage on site incorporating the installation of renewable energy measurers, a proposed wastewater treatment system and percolation area, extend existing hammerhead to accommodate a new vehicular entrance, proposed pillars to match existing, and (B) Permission for retention of a post and wire fence to the front of my site together with all associated site works.

Carriglen , Ballincollie , Dublin Pike

123m
2442682CONDITIONAL20 Feb 2024

Permission for development which will consist of 5 no. light industrial/warehouse units with ancillary offices, and site development works. Site development works to include, resurfaced access road, car parking, hardstanding, delivery areas, footpaths, pedestrian crossings, lighting, boundary treatment, drainage and landscaping works.

Ballincolly Industrial Estate , Dublin Hill , Cork City

137m
174838CONDITIONAL7 Apr 2017

Construction of 3 no. dwellinghouses with 3 no. waste water treatment systems, 3 no. new entrances and all associated site works.

Ballincolly Road , Ballincolly , Ballyvolane

145m
2442588CONDITIONAL4 Jan 2024

Permission for a development consisting of the construction of 7 no. residential dwellings in 3 no. detached dwelling houses and 1 no. apartment block. The development will consist of 3 no. 2-storey, 3-bed detached dwelling houses and Block A, a 2-storey apartment block providing 2 no. 1-bed apartments on first floor. The development will also include car parking, bicycle storage, refuse store, 4 no. new site entrances and all associated ancillary site development works including road widening and a new 2m wide footpath along the public road.

Ballincolly Road , Ballincolly , Ballyvolane

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?