Ballinoe , Station Road , Blarney

CONDITIONAL

Planning application 2240841

Cork - Cork City Council

Proposed Development

Permission is sought for (A) Construction of single storey extension at lower ground floor to rear of house, (B) Construction of 2 no. dormer windows to roof at rear of house and installation of velux windows to roof at front and rear of house , (C) Alterations to elevations, (D) Associated site development works, all to existing two storey over lower ground floor detached house.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Feb 2022

  2. Decision due

    30 Mar 2022

  3. Decision: CONDITIONAL

    30 Mar 2022

  4. Grant issued

    11 May 2022

Application Details

Location
Ballinoe , Station Road , Blarney
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council
Site Area
0.1125 ha

Timeline

Registration Date
3 February 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 March 2022
Grant Date
11 May 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

56m
2342010CONDITIONAL22 May 2023

Permission for the construction of a new single storey extension to the side of dwelling house and all associated site works at 5 Assumption Terrace, Station Road, Blarney, Cork.

5 Assumption Terrace , Station Road , Blarney

60m
2140244CONDITIONAL31 May 2021

Permission for to construct a two storey extension to the rear of our house, to construct a new ground floor bay window to the side, to demolish old existing kitchen to rear, to construct a 2.0m. high concrete block boundary wall with pedestrian gate to the rear and all associated ancillary site development works

No.9 Assumption Place , Station Road , Shean Upper

241m
175144N/A11 May 2017

The construction of 3 detached dwellinghouses and all associated site works.

Station Road , Shean Upper , Blarney

241m
175332CONDITIONAL30 May 2017

Construction of 3 detached dwelling houses and all associated site works.

Station Road , Shean Upper , Blarney

246m
175438CONDITIONAL8 Jun 2017

Construct a dwellinghouse

Site No. 24 Aisling Geal , Station Road , Shean Upper Blarney

249m
2443064CONDITIONAL5 Jul 2024

Permission for (1) Demolition of existing side boundary wall to be replaced by new timber fluted gate, (2) Construction of a single-storey side extension and two-storey rear extension for two number bedrooms to the existing dwelling house, (3) Elevational alterations to the side elevation of the existing dwelling house, (4) Construction of proposed side patio area and trellis area and proposed rear patio area to proposed extension to the existing dwelling house, (5) All associated site works.

25 Woodfield , Station Road , Blarney

290m
2543615CONDITIONAL5 Feb 2025

Retention permission for a garden room incorporating workspace/store and sitting area. Permission for the demolition of single storey rear extension, construction of a two storey extension and single storey conservatory to rear, an attic conversion including 2 no. dormer windows and new window to front, 1 No. rooflight to front and 1 no. roof light to rear, new windows to first floor east elevation of existing dwelling, and ancillary site development works to dwelling.

No. 7 Aisling Geal , Station Road , Blarney

315m
2443031CONDITIONAL27 Jun 2024

Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie

Ringwood , Shean Upper , Blarney

315m
2443031CONDITIONAL27 Jun 2024

Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie

Ringwood , Shean Upper , Blarney

320m
2140236CONDITIONAL28 May 2021

Permission for the retention of the dormer style extension to the rear of the dwelling.

The Cottage , Shean Upper , Station Road