Permission for the proposed change of use of an existing Two Storey Gymnasium and Indoor Sports Building Use to School and Staff Office Uses, Planning Permission for Proposed External Alterations to Building Elevations and Proposed Internal Alterations to provide Lecture Theatres , Staff Offices and ancillary Spaces, Planning Permission for proposed first floor extension for a new AHU Plantroom, and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Sept 2022

  2. Decision due

    17 Nov 2022

  3. Decision: CONDITIONAL

    17 Nov 2022

  4. Grant issued

    29 Dec 2022

Application Details

Location
Munster Technological University , Rossa Avenue , Bishopstown
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
23 September 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 November 2022
Grant Date
29 December 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

33m
2342227CONDITIONAL14 Aug 2023

Permission for the extension and alteration of the Nexus Hall, Student Centre, Munster Technological University, Bishopstown, Cork, T12T66T. The project includes the addition of a first-floor mezzanine level in the existing Nexus Hall to create a student's community work hub (approximately 267 sqm) and the addition of a covered external escape stair (approximately 20sqm).

Nexus Hall Student Centre , Munster Technological University , Bishopstown

33m
2342139N/A6 Jul 2023

Permission for the extension and alteration of the Nexus Hall, Student Centre, Munster Technological University, Bishopstown, Cork, T12T66T. The project includes the addition of a first-floor mezzanine level in the existing Nexus Hall to create a student's community work hub (approximately 267 sqm) and the addition of a covered external escape stair (approximately 20sqm).

Student Centre , Munster Technological University , Bishopstown

148m
2342560CONDITIONAL20 Dec 2023

For a 10 year grant of planning permission for proposed development to consist of the upgrading of 1974 building façade including fenestration and new insulated render system throughout with external signage and the construction of 7 no. external stairs and lift blocks, and all associated site works.

Munster Technological University , Rossa Avenue , Bishopstown

197m
2443450CONDITIONAL2 Dec 2024

Permission is sought for the construction and completion of underground firefighting water tanks (approximate capacity of 45 cubic measures) and all ancillary development. The retention works will modify the parent permission planning reference 19/38558 which is for the construction of a three storey Learning Resource Centre and ancillary works at Cork Institute of Technology Rossa Avenue Bishopstown Co. Cork.

Munster Technological University , Rossa Avenue , Bishopstown

199m
1938558CONDITIONAL19 Jul 2019

Permission for the construction of a three storey Learning Resource Centre at Cork Institute of Technology, Rossa Avenue, Bishopstown, Co. Cork. The development will consist of (I) A three storey building with maximum gross floor area of 6,666sqm with screened plant set back at roof level, (II) Provision of 143 no. bicycle stands; (III) Provision of a main plaza and associated landscaping connecting the proposed building with the existing 1970s building (Block B & C); (IV) Provision of a bus stop and bus waiting area on the existing access road to north of the proposed Learning Resource Centre ; (V) Temporary construction signage ; and (VI) All associated site development works. Pedestrian and vehicular access will be from the existing entrances on Rossa Avenue.

Cork Institute of Technology , Rossa Avenue , Bishopstown

201m
1938902CONDITIONAL27 Nov 2019

Permission for development which consists of a change of plan to that granted under Planning ref: 15/36283. The changes include additional floor area and minor elevation changes.

Cork Institute of Technology , Rossa Avenue , Bishopstown

201m
2442992CONDITIONAL7 Jun 2024

Permission is sought to construct a part single/part three storey high performance indoor athletics centre with associated sports laboratories, classrooms, studios and plant level (approx. area 5330sqm), and proposed link to existing MTU Arena (Phase 1) building, along with an external roof terrace, new photovoltaic panels on rooftop (area-342 sqm), new external lighting; new signage and assoicted landscaping, site and services works.

Munster Technological University , Rossa Avenue , Bishopstown

222m
2341794CONDITIONAL17 Feb 2023

Permission for the construction of a synthetic All-weather playing pitch 53m x 46m along with 6m high protective ball catching netting/security fencing and 4 no. floodlighting masts of maximum height 12m along with associated siteworks.

Munster Technological University , Rossa Avenue , Bishopstown

272m
2241351CONDITIONAL24 Aug 2022

Permission for a proposed energy efficient deep retrofit of the external building fabric to the existing multi purpose Melbourn building at 53 Melbourn Road, Bishopstown,Cork T12 P594. It is proposed to upgrade existing external walls / roofs and windows and doors with new energy efficient cladding panels / new glazing and new external wall insulation and the provision of a new external roof access stair to the northern elevation. No internal modifications are proposed.

Melbourn Building , 53 Melbourn Road , Bishopstown

273m
2241449CONDITIONAL3 Oct 2022

Permission for the construction of a new research and innovation centre at The Rubicon Centre, Munster Technological University, Bishopstown, Cork, T12Y275. The proposed accommodation includes canteen, open plan offices and support areas on approximately 542sqm over 2 storeys. PV panels will be located at roof level. The building will be connected to the existing Rubicon Centre via a first floor link corridor. Site works include relocation of 1no. existing car parking space and construction of additional 2 no. car parking spaces in a dedicated car parking area, minor modification to internal road layout, new landscape areas and planting to boundaries.

The Rubicon Centre , Munster Technological University , Bishopstown

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?