Proposed Development
Permission for the construction of a dwelling, garage with storage, vehicle entrance, private bore well, treatment plan and all associated site works.
Application Timeline
Application received
20 Oct 2022
Decision due
14 Dec 2022
Decision: REFUSED
14 Dec 2022
Appeal submitted
17 Jan 2023
Grant issued
22 Mar 2024
Appeal decided: REFUSED
22 Mar 2024
Application Details
- Location
- Woodside , Carrigrohane , Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 20 October 2022Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 14 December 2022
- Grant Date
- 22 March 2024
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-315578-22
- Decision
- REFUSED
- Submitted
- 17 January 2023
- Decided
- 22 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
To construct a dwelling, garage, entrance, proprietary treatment system and all associated site works.
Woodside , Carrigrohane , Co.Cork
Construct dwelling, garage, entrance, proprietary treatment system and all associated site works.
Woodside , Carrigrohane , Co. Cork
Permission is sought for alterations to the external wall finishes, removal of masonry chimney stacks, modifications to front elevation lower roof, relocation of 1st floor rear window and construct new window, construction of a single storey side extension and all associated site works to an existing dwellinghouse.
Laburnham House , Bawnafinny , Tower
Permission is sought for alterations to the external wall finishes, removal of masonry chimney stacks, modifications to front elevation lower roof, relocation of 1st floor rear window and construct new window, construction of a single storey side extension and all associated site works to an existing dwellinghouse.
Laburnham House , Bawnafinny , Tower Blarney
Permission for the continuation of use for a transmission and communications station comprising a 24 metre high structure with associated equipment attached and with ground containers and cabinets within a chain-link fence compound at Bawnafinny (TD), Blarney, County Cork. This application is subsequent to a previous grant of permission by Cork County Council planning reference 12/05524.
Bawnafinny (TD) , Blarney , County Cork
The partial demolition of existing dwelling, the construction of extensions to front and rear of dwelling, the increase in height of the main roof by 500mm to accommodate new first floor living space and all associated site works
Bawnafinny , Blarney , Co. Cork
Removal of existing glasshouses and the construction of 22 no dwelling houses (10 no. houses will have an option of a rear extension and 4 no. houses will have an option of a rear sunroom) and all associated ancillary development works including access, roads, parking, footpaths, drainage, landscaping and amenity areas.
Kilcrenagh , Woodside , Kerry Pike
Permission is sought for the development of ground-mounted photovoltaic solar panels with a maximum actual square meterage of 486m2 distributed over a grass area on-site with associated ancillary works.
Blarney Waste Water , Treatment Plant , Riverview Estate Tower
1) The demolition and removal of partially completed 6 no. residential units, 2) the construction of 60 no. dwelling houses (comprising of 38 no. 4 bed units with optional rear sunroom and optional side ground floor windows and 22 no. 3 bed units (8 no. 3 bed units with optional rear sunroom and optional side ground floor windows and 14 no. 3 bed units with optional side ground floor windows)) and 3) all associated ancillary development works including access, footpaths, parking, drainage, landscaping and amenity areas and the removal of the existing marketing kiosk at the entrance to the site on completion of the housing development.
Gleann Fia , Bawnnafinny (Townland) , Tower Blarney
1) The demolition and removal of partially completed 6 no. residential units, 2) the construction of 60 no. dwelling houses (comprising of 38 no. 4 bed units with optional rear sunroom and optional side ground floor windows and 22 no. 3 bed units (8 no. 3 bed units with optional rear sunroom and optional side ground floor windows and 14 no. 3 bed units with optional side ground floor windows)) and 3) all associated ancillary development works including access, footpaths, parking, drainage, landscaping and amenity areas and the removal of the existing marketing kiosk at the entrance to the site on completion of the housing development.
Gleann Fia , Bawnnafinny (Townland) , Tower Blarney
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?