Proposed Development
Permission for development of this site at Jury's Inn, Anderson's Quay, Centre, Cork, T12DCR9. The development will consist of the erection of new hotel signage which will consist of the following; 1 no. sign (3.05m x 3.05m) and 2 no. signs (0.6m x 0.6m) on the northern façade and 2 no. signs (3.05m x 3.05m) on the eastern elevation, each with static LED Face illumination.
View the full application file on the council's planning portal →Application Timeline
Application received
21 Nov 2022
Decision due
24 Jan 2023
Decision: CONDITIONAL
24 Jan 2023
Grant issued
7 Mar 2023
Application Details
- Location
- Jurys Inn , Andersons Quay , Centre
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 21 November 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 January 2023
- Grant Date
- 7 March 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission is sought for the removal of existing double entrance doors to ground floor office unit on Custom House Street and the installation of 3no. fixed glass window panels including, internal modifications and all ancillary works
City Quarter , 11-13 Lapp's Quay Street , Cork
Permission is sought... to change the use of the existing ground floor unit, City Quarter Building, Lapp's Quay, Cork (formerly the "Aga" store), previously permitted under planning ref. 02/26737. The change of use will be from existing retail to proposed office use (235 sqm.). Planning permission is also sought for all necessary site services and ancillary works necessary to facilitate the development.
Ground floor unit , City Quarter Building , Lapps Quay
the construction of an office building which will comprise of fifteen (15) storeys above ground level and a gross floor area of circa 5,985m2 on a triangular site which is bounded by Clontarf Street, Deane Street and Oliver Plunkett Street Lower in Cork City. The proposed ground floor use will comprise of lobby, office rooms and building services and the first to fourteenth floors will comprise of office use and building services. A roof top terrace will be provided for staff above the fourteenth floor and will include a canopy structure that will oversail the public footpath adjoining Clontarf Street. A glass canopy oversails Deane Street at the third floor level. From the third floor up to the roof terrace the proposed building will overhang the public footpaths along Clontarf Street and Oliver Plunkett Street Lower by approximately 2 metres. The proposed development will also include a double basement with ancillary plant and equipment and a water tank. The main pedestrian access to the building will be via Clontarf Street and the existing electricity substation will be relocated within a secure room on the ground floor of the proposed building with secure access from Deane Street.
Clontarf Street , Deane Street , and Oliver Plunkett Street Lower
Permission for change of use from office to dental surgery and all associated site works.
Unit 25 , 25 Penrose Wharf , Penrose Quay
Planning permission is sought by Tower Development Properties Ltd for: Redevelopment of the Custom House site at North Custom House Quay and South Custom House Quay, Custom House Street, Cork City to provide a 240-bedroom hotel, 25 no. hotel serviced suites, and a range of commercial uses including retail, office, food and beverage, distillery, tourism and leisure. The redevelopment will have a gross floor area of approximately 31, 604m2. The proposed development consists of the carrying out of works to Protected Structures PS060, PS818 and PS163. An Environmental Impact Assessment Report will be submitted to the Planning Authority with the application. A Natura Impact Statement will be submitted to the Planning Authority with the application.
North Custom House Quay and , South Custom House Quay , Custom House Street
Permission for the change of use of their premises at Unit 1B, Penrose Wharf, Penrose Quay, Cork, T23 NX9W. Ground floor: change of use from assembling , manufacturing, storage and retail to office.
Unit 1B , Penrose Wharf , Penrose Quay
Permission is sought for the change of use of unit 1C from assembling manufacturing, storage and retail to offices, the change of use of unit 1D from assembling manufacturing, storage and retail to café space, shopfront alterations, internal alterations and associated site works.
Unit 01 , Penrose Wharf , Penrose Quay
permission is sought for the subdivision of an existing retail unit, and the change of use of one of the subdivided units (unit 01 A) from assembling manufacturing, storage and retail to offices, and associated site works
Unit 1 , Penrose Wharf , Penrose Quay
The proposed development will consist of the partial demolition, redevelopment and extension of 7/8 and 9 Parnell Place(Protected Structures Ref:PS271, PS272 and PS273):the demolition of existing structures to the rear of 7/8 and 9 Parnell Place on Deane Street, Cork, excluding a red brick chimney: and the demolition of existing structures on Deane Street, Cork, including the demolition of a habitable house, to facilitate a hotel-development of 165 no. bedrooms of between 3-7 storeys plus rooftop plant, principally accessed from Deane Street, as well as Parnell Place, with ground floor reception area, restaurant/bar, retail unit, foodhall and café/retail unit. The proposed development includes a new skylight to the roof of 7/8 Parnell Place and a new roof extension and rooflight to 9 Parnell Place: a link bridge on 3 levels connecting 7/8 Parnell Place to the new building fronting Deane Street; green roofs; rooftop plant enclosures; signage; bin stores; ESB substation; and all associated ancillary services. The proposed development also includes the re-opening of an historic laneway connecting Parnell Place with Deane Street, a set down area on Deane Street and all associated site development, elevational treatment and landscaping works.
Site bounded by 7/8 & , 9 Parnell PlaceDeane Street , & Oliver Plunkett Street Lower
Permission for construction of a new four storey mixed development building consisting of: (1) Ground floor retail unit, refuse and bike store. (2) 2 duplex apartments on upper floors, (3) Roof garden and glazed enclosure, (4) And all associated site development works.
No. 1 Brian Boru Street , Cork City
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.