← Back to search

Classes Childcare , 2 Maryville , Friars Walk

CONDITIONAL

Planning application 2443076

Cork - Cork City Council

Proposed Development

Permission for the following works; (1) To construct new single-storey extension to rear elevation of existing 2-storey creche facility, (2) Proposed minor alterations to internal layout of creche at ground floor only, (3) Proposed minor alterations to existing side and rear alterations to existing side and rear elevations of creche at ground floor only, (4) To remove existing storage shed from site, and (5) All associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Jul 2024

  2. Decision due

    3 Sept 2024

  3. Decision: CONDITIONAL

    3 Sept 2024

  4. Grant issued

    14 Oct 2024

Application Details

Location
Classes Childcare , 2 Maryville , Friars Walk
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council
Site Area
0.0167 ha

Timeline

Registration Date
10 July 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 September 2024
Grant Date
14 October 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
1837821CONDITIONAL16 Mar 2018

full planning permission for retention of (1) Change of use from a domestic dwelling to a crèche and (2) all associated site works

2 Maryville , Friar's Walk , Cork City

0m
1837998CONDITIONAL27 Jul 2018

Permission for; (1) Removal of existing toilet block at the rear of the existing crèche (2) a single storey ground floor extension to the rear of the existing crèche, (3) a change of layout of the original premises, (4) changes to the North, South & East Elevations, and (5) All associated works

2 Maryville , Friar's Walk , Cork City

0m
2442651CONDITIONAL9 Feb 2024

Permission for the following works; (1) To construct new extensions to rear of existing creche at ground floor level and new flat roof extension at first floor level, (2) Proposed minor alterations to internal layout of creche, (3) To remove existing storage shed from site, (4) All associated site works.

Classes Childcare , 2 Maryville , Friars Walk

10m
1837936CONDITIONAL12 Jun 2018

permission for retention of single storey rear extension attached to dwelling

No. 1 Maryville , Friars Walk , Cork

12m
1837868REFUSED27 Apr 2018

Permission for a change of use of former workshop to a 2 Bedroom Residential Unit. Alterations and extension include the following elements A) alterations to existing ground level elevations, B) Removal of the existing roof structure & provision of configured roof profile with increase in ridge height, C) addition of first floor element with habitual accommodation, D)addition of ground floor entrance porch together with all associated site works

1A , Maryville , Friars Walk

13m
1838137CONDITIONAL22 Nov 2018

Permission for a change of use of former workshop to a 1 Bedroom residential unit. Alterations and extension include the following elements, A) alterations to existing ground level elevations, B) removal of the existing roof structure and provision of reconfigured roof profile with increase in ridge height, C) addition of 1st floor element with habitable accommodation, together with all associated site development works.

1A Maryville , Friars Walk , Cork

27m
2443317CONDITIONAL14 Oct 2024

permission for the construction of an extension to the rear of an existing dwelling alterations to existing elevations to include 1 no roof light and all associated site works

8 Millbrook Lawn , Friars Walk , Cork

46m
2443441CONDITIONAL29 Nov 2024

Permission to demolish existing derelict terraced three storey dwelling sub-divide existing site and construct two no. 3 storey terraced dwellings with part two storey at the rear with second floor balconies also at rear and all associated site development works.

15 Friars Walk , Cork City

55m
1938518CONDITIONAL5 Jul 2019

Permission is sought for planning on behalf of Daniel Mulcahy, 19 St.Patrick's Road,Turners Cross, Cork by Phi Consulting Engineers, 20 South Mall, Cork for the demolition of the existing kitchen extension and construction of a single-storey extension at the rear of the dwelling, the conversion of the existing attic to include four proposed roof lights at the front elevation and two dormer windows at the rear elevation and all associated site works.

St. Patrick's Road , Turner's Cross , Cork

55m
2140602CONDITIONAL28 Oct 2021

Permission is sought for the retention of two dormer windows and 3 number rooflights at the rear elevation of the existing dwelling house.

19 St. Patricks Road , Turners Cross , Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?