← Back to search

CAMETRINGANE, CAMETRINGANE,

CONDITIONAL

Planning application 00/3213

Cork - Cork County Council

Application Timeline

  1. Application received

    26 May 2000

  2. Decision due

    26 Jul 2000

  3. Decision: CONDITIONAL

    17 Nov 2000

  4. Grant issued

    20 Dec 2000

Application Details

Location
CAMETRINGANE, CAMETRINGANE,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
26 May 2000Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 November 2000
Grant Date
20 December 2000

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

90m
01/4241REFUSED20 Jul 2001

Construction of end-of-terrace single storey dwelling

CAME POINT, CAME POINT, CAMETRINGANE,

90m
01/392REFUSED2 Feb 2001

Construction of single storey dwelling

CAME POINT, CAME POINT, CAMETRINGANE,

160m
17/702Conditional8 Nov 2017

(i) Demolition of existing plant room building, (ii) Removal of existing storage container, (iii) Construction of new single storey plant room/storage building and retaining wall, (iv) Installation of 21no. individual camping pods each consisting of a timber pod structure with single bedroom and shower room and (v) All associated site works required for the pods including installation of access paths and service connections

Cametringane Castletownbere Co. Cork

161m
15/565INCOMPLETED APPLICATION8 Oct 2015

Demolition of existing 2 storey structure and link to main building and all associated works at licensed premises

Beara Coast Hotel Cametringane Castletownbere Co. Cork

323m
26/0839Grant with Conditions2 Apr 2026

The removal of an existing rock outcrop to form a stone hard standing area including associated site works. Rock romoved is to be temporarily stored within property of DAFM on Dinish Island prior to reuse within 18 months. The proposed site is situated towards the western end of Dinish Island within the property of Castletownbere Fishery Harbour Centre.

Castletownbere Fishery Harbour Centre, Dinish Island, Castletownbere, Co. Cork

370m
22/380INCOMPLETED APPLICATION3 Jun 2022

The proposed development consists of a small craft harbour, which will provide mooring capacity to 32 inshore fishing vessels with a maximum size of 18m length overall (LOA), for all tidal conditions. The Small Craft Harbour will consist of a main walkway and multiple finger pontoons and will be connected to the land via a gangway. Safety light and service pedestal will be installed on the Small Craft Harbour

Dinish Island Castletownbere Co. Cork

377m
01/403CONDITIONAL2 Feb 2001

Construction of tourist office (timber framed building)

ST. PETER'S CHURCH, ST. PETER'S CHURCH, KNOCKANEROE,

380m
02/3762CONDITIONAL26 Aug 2002

Alterations, two storey extension & change of use of commercial premises to youth hostel & demolition of single storey building

KNOCKANEROE, KNOCKANEROE,

386m
07/2670INCOMPLETED APPLICATION18 Oct 2007

Construction of extensions to existing production facility

Dinish Island Castletownbere Beara

386m
07/2799CONDITIONAL5 Nov 2007

Construction of extensions to existing production facility

Dinish Island Castletownbere

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?