DROMIDICLOGH WEST, DROMIDICLOGH WEST,
CONDITIONALPlanning application 01/3142
Cork - Cork County Council
Proposed Development
Construction of a two storey research & development building
Application Timeline
Application received
1 Jun 2001
Decision: CONDITIONAL
30 Jul 2001
Decision due
1 Aug 2001
Grant issued
3 Sept 2001
Application Details
- Location
- DROMIDICLOGH WEST, DROMIDICLOGH WEST,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 1 June 2001
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 July 2001
- Grant Date
- 3 September 2001
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Above ground gas installation with ancillary building & pipework
CARBERY MILK PRODUCTS- CARBERY MILK PRODUCTS- LTD, DROMIDICLOGH WEST,
Extension to cheese processing facility
DROMIDICLOGH WEST, DROMIDICLOGH WEST,
Retention of extension to laboratory over milk intake area and completion of stairs to the west elevation of milk intake area
DROMIDICLOGH WEST, DROMIDICLOGH WEST,
Production facility to cater for increased production requirements
Dromidiclough West Ballineen
The demolition of an existing 2-storey detached dwelling and ancillary structures, including fencing, gates, and part of the existing front boundary walls; removal of existing signage; extensions to the main plant and warehouse building, to include: part single-storey/part 2-storey tank room/storage area, with upper floor laboratory/MCC room and lobby, to the south-western elevation; new door, part single-storey processing plant area, and 2-storey loading docks/office, to the southern elevation; new first floor processing/plant area to existing internal processing area; and new single-storey extension/infill to the existing internal open loading bay area, including increase in roof height. The proposed development will also consist of a single-storey extension to the existing chill water plant; signage: 5 no. car parking spaces; new doors/fire doors/roller shutter doors; 5 no. new storage vessels and associated pipe bridge; 10 no. existing storage vessels to be replaced and increased in height; additional roof-top plant (AHU's, extract fans, roof access ladders/gantry); all site development works, landscaping, drainage and ancillary development including: elevational treatment; revisions to the existing easternmost vehicular entrance, including erection of new retaining boundary wall and fencing; revisions to the westernmost vehicular access, including replacement and relocation of existing weighbridge and new single-storey weighbridge office and associated works; and the relocation of 3 no. flagpoles. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. This application relates to a development which comprises of an activity for which an Industrial Emissions License under part IV of the Environment comprising of an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency 1992 (as amended) is required. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.
Carbery Group Plant Carrigmore Dromidiclogh West Ballinneen, Co. Cork
Remove part of existing roof of existing Cheese Production Building and construct new roof at higher level including new cladded walls, to facilitate installation of new equipment necessary as part of upgrading and modernising existing facility
Dromidiclogh West Ballineen
New cladding and curtain wall glazing system to west façade of existing office administration building with new glazed entrance porch and replacement of 18no. existing windows and provision of 2no. new skylights at first and second floor levels with associated site development and landscape works
Carrigmore Dromidiclogh West Ballineen
car park, water storage tank with pump house, storage bund & Retention of workshop, hut, scaffold shed, switch room & boundary fence.
DROMIDICLOGH WEST, DROMIDICLOGH WEST,
Site developments; extension and alterations works comprising the construction of, a new weighbridge office and additional weighbridge, two new milk unloading stations and three associated milk silos and four associated cip tanks, re-cladding of side sheeting to existing milk intake units, increase in roof height of existing cheese production building and associated adjustments to front elevation, construction of new ancillary offices to the cheese manufacturing facility, the construction of a distribution corridor with the provision of two loading docks; a new food ingredients building for the production of yeast based powdered food ingredients; modifications to the existing warehouse comprising the construction of three new loading docks and associated canopies, alterations to site entrances and modifications to effluent treatment plant, modifications to internal site roads, provision of fencing, landscape works, associated yard and site works, all at their existing production site
Dromidiclogh West Ballineen
Construction of new food ingredients building comprising of wet process area, dryer area and associated parking and storage, alterations to internal roads, provision of fencing, landscape works, associated yard and site works
Dromidiclough West Ballineen
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?