← Back to search

CAMETRINGANE, CAMETRINGANE,

REFUSED

Planning application 01/4689

Cork - Cork County Council

Application Timeline

  1. Application received

    17 Aug 2001

  2. Decision: REFUSED

    15 Oct 2001

  3. Decision due

    17 Nov 2001

Application Details

Location
CAMETRINGANE, CAMETRINGANE,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
17 August 2001Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
15 October 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

64m
01/4241REFUSED20 Jul 2001

Construction of end-of-terrace single storey dwelling

CAME POINT, CAME POINT, CAMETRINGANE,

64m
01/392REFUSED2 Feb 2001

Construction of single storey dwelling

CAME POINT, CAME POINT, CAMETRINGANE,

143m
17/702Conditional8 Nov 2017

(i) Demolition of existing plant room building, (ii) Removal of existing storage container, (iii) Construction of new single storey plant room/storage building and retaining wall, (iv) Installation of 21no. individual camping pods each consisting of a timber pod structure with single bedroom and shower room and (v) All associated site works required for the pods including installation of access paths and service connections

Cametringane Castletownbere Co. Cork

145m
15/565INCOMPLETED APPLICATION8 Oct 2015

Demolition of existing 2 storey structure and link to main building and all associated works at licensed premises

Beara Coast Hotel Cametringane Castletownbere Co. Cork

159m
03/5550CONDITIONAL7 Nov 2003

Construction of a purpose built child care centre, septic tank and puraflo treatment unit

Cametringane Castletownbere Co. Cork

289m
26/0839Grant with Conditions2 Apr 2026

The removal of an existing rock outcrop to form a stone hard standing area including associated site works. Rock romoved is to be temporarily stored within property of DAFM on Dinish Island prior to reuse within 18 months. The proposed site is situated towards the western end of Dinish Island within the property of Castletownbere Fishery Harbour Centre.

Castletownbere Fishery Harbour Centre, Dinish Island, Castletownbere, Co. Cork

338m
22/380INCOMPLETED APPLICATION3 Jun 2022

The proposed development consists of a small craft harbour, which will provide mooring capacity to 32 inshore fishing vessels with a maximum size of 18m length overall (LOA), for all tidal conditions. The Small Craft Harbour will consist of a main walkway and multiple finger pontoons and will be connected to the land via a gangway. Safety light and service pedestal will be installed on the Small Craft Harbour

Dinish Island Castletownbere Co. Cork

351m
07/2670INCOMPLETED APPLICATION18 Oct 2007

Construction of extensions to existing production facility

Dinish Island Castletownbere Beara

351m
07/2799CONDITIONAL5 Nov 2007

Construction of extensions to existing production facility

Dinish Island Castletownbere

359m
18/352CONDITIONAL19 Jun 2018

Retention of construction of detached Compressor House and of alterations to elevations of Calcareous Marine Algae facility and Permission for additions to same to include (a) lean-to canopy to east, (b) lean-to pallet store to north and (c) loading dock to south

Dinish Island Castletownbere Beara Co Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?