Proposed Development
Tarmacadam/asphalt manufacturing plant & anc. works incl. electrical control building, control cabin, bitumen & fuel storage tanks
View the full application file on the council's planning portal →Application Timeline
Application received
3 Jul 2002
Decision due
23 Aug 2002
Application Details
- Location
- COOLACLEVANE, COOLACLEVANE,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 July 2002
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 23 August 2002
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
SEE APPLICATION FOR DETAILS
COOLACLEVANE, COOLACLEVANE,
The development will consist of the erection and operation of an asphalt plant (Stack height 20 meters) within an overall application area of 0.15 ha. at the existing quarry landholding.
Coolaclevane Kilmichael Co.Cork
Concrete manufacturing plant & ancillary works at existing quarry
COOLACLEVANE, COOLACLEVANE,
The acceptance, storage and crushing of waste concrete from the applicant and other external sources for recycling and re-use consisting of storage and crushing of the concrete. The crushed materials will be utilised in the production of new concrete products. Proposed works include new concrete slab, petroleum/oil interceptor and percolation area. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.
Coolaclevane Kilmichael Co. Cork
Permission for the acceptance, storage and crushing of waste concrete from the applicant and other external sources for recycling and re-use consisting of storage and crushing of the concrete. The crushed materials will be utilised in the production of new concrete products. Proposed works include new concrete slab, petroleum/oil interceptor and percolation area. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.
Coolaclevane Kilmichael Co. Cork
Construction of concrete batching plant and concrete yard for block making
Coolaclevane Kilmichael
Concrete batching plant and concrete yard for block making
Coolaclevane Kilmichael
A Concrete Manufacturing Facility comprising of a Concrete Batching Plant (for production of Readymix and Blocks), Mobile Block Making Machine, associated Block Production Area (2,700 m²) and Block Storage Area (1,300 m²), Closed Circuit Lagoon System, Concrete Recycling Plant and all ancillary works within an application area of c. 0.7 Ha
Coolaclevane Kilmichael Co. Cork
A Concrete Manufacturing Facility comprising of a Concrete Batching Plant (for production of Readymix and Blocks), Mobile Block Making Machine, associated Block Production Area (2,700 m²) and Block Storage Area (1,300 m²), Closed Circuit Lagoon System, Concrete Recycling Plant and all ancillary works within an application area of c. 0.7 Ha
Coolaclevane Kilmichael Co. Cork
Acceptance, storage and crushing of waste bituminous mixtures (tarmacadam) from other external sources for recycling and re-use consisting of storage and crushing of waste. The crushed materials will be utilised in the production of new tarmacadam. Proposed works include concrete slab, petroleum/oil interceptor and percolation area
Coolaclevane Kilmichael Co Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?