Application Timeline
Application received
14 Apr 2003
Decision due
9 Jun 2003
Application Details
- Location
- GARRANURE, GARRANURE,
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 14 April 2003
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 9 June 2003
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erect a single storey dwelling and the installation of a septic tank and percolation area
Garranure Dunmanway Co. Cork
Dwelling
Garranure Dunmanway
Domestic garage
GARRANURE, GARRANURE,
Extensions to dwellinghouse
Garranure Dunmanway
Construction of four wind turbines, electrical substation with control building, meterological mast, upgrading of site entrance and associated site works
Garranure & Kilvinane Ballinacarriga Dunmanway
Windfarm consisting of 4 wind turbines,electrical substation with control building, 50m meteorological mast, upgrading of entrance & assoc. works
GARRANURE, GARRANURE,
4 Turbines, electrical substation, mast and associated works
Garranure and Kilvinane, Ballynacarriga, Dunmanway, Co. Cork
Modification of an existing windfarm development permitted under Planning Reg. No. 01/980 at Garranure, Kilvinane and Carrigeen, Ballynacarriga, Dunmanway, Co. Cork. The proposed development comprises of the replacement of two existing wind turbines (hub height 60m, rotor diameter 80m) with two larger turbines (max. hub height 67m, max. rotor diameter 90m)
Garranure, Kilvinane and Carrigeen Ballynacarriga Dunmanway Co. Cork
Erection of 1 no. 40m high mast with wind monitoring anenometer
GARRANURE, GARRANURE,
Alterations & extensions to dwellinghouse
GARRANURE, GARRANURE,
The submission window has closed
Observations on this application closed on Sunday 18 May 2003, five weeks after it was received. The authority cannot accept a late submission.