← Back to search

BALLYNEAGUE, BALLYNEAGUE,

CONDITIONAL

Planning application 03/4512

Cork - Cork County Council

Proposed Development

Construction of dwelling and conversion of derelict dwelling to domestic garage

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Sept 2003

  2. Decision due

    3 Nov 2003

  3. Decision: CONDITIONAL

    3 Nov 2003

  4. Grant issued

    9 Dec 2003

Application Details

Location
BALLYNEAGUE, BALLYNEAGUE,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
8 September 2003
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 November 2003
Grant Date
9 December 2003

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

483m
07/8932CONDITIONAL22 Jun 2007

Construction of farm building comprising of cubicle house, calf/loose house, feeding passage, cattle shed with slatted tank, silage pit with apron, machinery shed and ancillary works

Ballyneague Park Youghal

647m
26/2133Awaiting Recommendation13 Aug 2026

We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Grid

Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen, Cornaveigh,, Cork, Ireland

647m
25/6876Invalid - Case Closed19 Dec 2025

The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. We, Orsted Onshore Ireland Midco Ltd, intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210 ha of solar panels fixed on ground-mounted frames. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning applicatio

Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen, Cornaveigh,, Cork, Ireland

690m
07/12768REFUSED30 Nov 2007

Dwelling, garage and installation of wastewater treatment unit

Youghalpark Youghal

771m
08/5642CONDITIONAL26 Mar 2008

One and half storey dwellinghouse, garage and installation of waste water treatment unit

Youghalpark Youghal

803m
10/4465INCOMPLETED APPLICATION2 Mar 2010

Storey and a half style dwelling, garage & wastewater treatment unit

Youghalpark Youghal

805m
10/4693INCOMPLETED APPLICATION26 Mar 2010

Construction of a storey and a half style dwelling, garage and wastewater treatment unit

Youghalpark Youghal

826m
14/5686INCOMPLETED APPLICATION6 Aug 2014

Dwelling, detached domestic garage, new site entrance and sewage treatment system and all other associated site works

Youghalpark Youghal

830m
19/5616UNCONDITIONAL21 Jun 2019

Dwelling, detached domestic garage, new site entrance and sewage treatment system and all other associated site works. Extension of Duration of Permission granted under Planning Reference: 14/5881.

Youghalpark Youghal Co. Cork

830m
14/5881CONDITIONAL4 Sept 2014

Dwelling, detached domestic garage, new site entrance and sewage treatment system and all other associated site works

Youghalpark Youghal Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?