Proposed Development
Relocation of entrance to driveway to dwelling permitted under reg. no. N/02/3537
View the full application file on the council's planning portal →Application Timeline
Application received
23 Feb 2004
Decision due
18 Apr 2004
Decision: CONDITIONAL
19 Apr 2004
Grant issued
25 May 2004
Application Details
- Location
- Turbeigh Mitchelstown
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 February 2004
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 April 2004
- Grant Date
- 25 May 2004
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Four-bedroom, two-storey dwelling house with sewage treatment plant & percolation area, drive way & new entrance onto public road
Turbeagh Mitchelstown
Construction of two-storey dwellinghouse, sewage treatment plant, percolation area, driveway and new entrance onto public road
Turbeagh Mitchelstown
Dwellinghouse and garage
Ballybeg Mitchelstown
Dwellinghouse and garage
Ballybeg Mitchelstown
Dwellinghouse and garage
Ballybeg Mitchelstown
To construct a two storey dwellinghouse, domestic garage, septic tank with percolation area and all associated site works
Ballybeg Mitchelstown Co. Cork
150kw wind turbine 40metre high with a blade diameter of 27 metre, a new access roadway connecting the existing private roadway with underground ducting connecting the existing ESB substation, and all associated site works
Hilltop Farm Turbeagh Mitchelstown Co.Cork
150kw wind turbine 40 metres high with a blade diameter of 27m, a new access roadway connecting to existing private roadway with underground ducting connecting to the existing sub-station, and all associated site works
Hilltop Farm Turbeagh Mitchelstown
Erection of 150kW wind turbine 40 metres high with a blade diameter of 27 metres, a new access roadway connecting to existing private roadway with underground ducting connecting to the existing sub-station, and all associated site works
Hilltop Farm Turbeagh Mitchelstown Co.Cork
Erect a 150kw wind turbine 40 metre high with a blade diameter of 27 metres, a new access roadway connecting to existing private roadway with underground ducting connecting to existing sub-station and all associated site works
Hilltop Farm Turbeagh Mitchelstown