Application Timeline
Application received
16 Jan 2004
Decision due
5 May 2004
Decision: CONDITIONAL
5 May 2004
Grant issued
10 Jun 2004
Application Details
- Location
- Carrig Glenville
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 16 January 2004Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 May 2004
- Grant Date
- 10 June 2004
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
SEE APPLICATION FOR DETAILS
KILLEAGH, KILLEAGH,
Construction of an extension to the dry sow house, service house and a gilt house. The development proposed is for compliance with welfare legislation and will not increase stock numbers
Killeagh Glenville .
Construction of an extension to dry sow house, service house and gilt house. The development proposed is for compliance with welfare legislation and will not increase stock numbers
Killeagh (ED Carrig) Glenville .
We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) and all associated ancillary works; • Forestry felling of 13 ha to facilitate construction and operation of the Proposed Development; and • All associated infrastructure, services and site works including excavation, earthworks, soil management, drainage and sediment control to facilitate the works. • A 10-year planning permission is being sought for the construction of the Proposed Development, alongside an operational period of 30 years. The underground cabling is intended to connect the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) to the proposed 110kV onsite substation at Lackendarragh North which is the subject of a separate application for consent to An Coimisiún Pleanála. This separate consent application includes the proposed onsite 110 kV substation at Lackendarragh North and associated works including 110 kV underground grid connection cabling between Lackendarragh North and the existing 110 kV Barrymore substation at Kill-Saint-Anne-North, Co. Cork. Coom Green Energy Park along with its grid connection was previously subject to EIA pursuant to planning ref. ACP Ref: 04.308885. The EIAR submitted with this application for consent assesses the entire project which includes all infrastructure associated with both applications for planning consent including the permitted Coom Green Energy Park. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.
The townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, County Cork
We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) and all associated ancillary works; • Forestry felling of 13 ha to facilitate construction and operation of the Proposed Development; and • All associated infrastructure, services and site works including excavation, earthworks, soil management, drainage and sediment control to facilitate the works. • A 10-year planning permission is being sought for the construction of the Proposed Development, alongside an operational period of 30 years. The underground cabling is intended to connect the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) to the proposed 110kV onsite substation at Lackendarragh North which is the subject of a separate application for consent to An Coimisiún Pleanála. This separate consent application includes the proposed onsite 110 kV substation at Lackendarragh North and associated works including 110 kV underground grid connection cabling between Lackendarragh North and the existing 110 kV Barrymore substation at Kill-Saint-Anne-North, Co. Cork. Coom Green Energy Park along with its grid connection was previously subject to EIA pursuant to planning ref. ACP Ref: 04.308885. The EIAR submitted with this application for consent assesses the entire project which includes all infrastructure associated with both applications for planning consent including the permitted Coom Green Energy Park. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.
The townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork
Construction of cattle shed and slatted tanks
Carrig Glenville
Dwelling
Knoppoge Glenville
Dwellinghouse
Knoppoge Glenville
Dwelling
Knoppoge Glenville
Dwelling
Carrig Glenville
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?