Application Timeline

  1. Application received

    21 Apr 2004

  2. Decision: CONDITIONAL

    3 Aug 2004

  3. Decision due

    4 Aug 2004

  4. Grant issued

    8 Sept 2004

Application Details

Location
Knockaunavaddreen Ballclogh Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
21 April 2004
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 August 2004
Grant Date
8 September 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
07/10373CONDITIONAL20 Aug 2007

Retention and completion of one and half storey dwellinghouse

Knockaunavaddreen Ballyclogh Mallow

125m
04/256CONDITIONAL21 Jan 2004

Dwellinghouse

Knockaunavaddreen Ballyclough Mallow

323m
05/6654CONDITIONAL14 Sept 2005

Dwellinghouse

Croughta Mallow

372m
08/5304CONDITIONAL10 Mar 2008

Retention of alterations to dwellinghouse to include replacement of patio door with window on western elevation, replacement of window with patio door on Southern elevation and moving of window and back door to accommodate same, moving of meter boxes from east to west gable, replacement of white PVC fascia, soffit and windows with black PVC fascia and soffit and brown PVC windows and construction of 1.4m high capped block wall boundary around site

Knockaunavaddreen Ballyclough Mallow

434m
05/792REFUSED15 Feb 2005

Dwelling

Knockaunavaddreen Lisgriffin

538m
24/5503Conditional Permission9 Aug 2024

The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38 kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The proposed grid connection will be installed underground mainly within the public road from the wind farm site at Croughta, Ballyclogh to the boundary of the 110 Kilovolts substation at Saint Joseph’s Road, Mallow passing through the townlands of Kilmaclenine, Croughta, Knockaunavaddreen, Copestown, (Kilmaclenine E.D.), Ballybeg (Buttevant E.D.), Baltydaniel East, Twopothouse, and Caurraghakerry (Caherduggan E.D); and Cloghlucas North, Curraghphadeen, Ballyviniter Upper, Ballyviniter Middle, Ballyviniter Lower, Parkadallane, Carrigoon More and Carrigoon Beg Mallow Rural E.D.).

Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork

538m
24/5215INCOMPLETED APPLICATION28 Jun 2024

Permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Croughta, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The prop

Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork

606m
12/5590INCOMPLETED APPLICATION20 Jul 2012

Construction of a two storey dwelling complete with treatment plant, percolation area, entrance piers and ancillary works

Croughta Ballyclough Mallow Co. Cork

609m
12/5809CONDITIONAL22 Aug 2012

Construction of a two-storey dwelling complete with treatment plant, percolation area, entrance piers and ancillary works

Croughta Ballyclough Mallow

609m
12/5342INCOMPLETED APPLICATION20 Jun 2012

Construction of a two storey dwelling complete with treatment plant, percolation area, entrance piers and ancillary works

Croughta Ballyclough Mallow Co. Cork