← Back to search

Lyravarrig Glenville

CONDITIONAL

Planning application 04/3180

Cork - Cork County Council

Proposed Development

Demolition of cubicle shed and silage pit and construction of slatted shed

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 May 2004

  2. Decision: CONDITIONAL

    28 Jan 2005

  3. Decision due

    29 Jan 2005

  4. Grant issued

    7 Mar 2005

Application Details

Location
Lyravarrig Glenville
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
10 May 2004Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 January 2005
Grant Date
7 March 2005

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
07/4622CONDITIONAL31 Jan 2007

Construction of cattle shed above proposed slurry tank

Lyravarrig Glenville

265m
26/2424Invalid - Case Closed17 Sept 2026

We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) and all associated ancillary works; • Forestry felling of 13 ha to facilitate construction and operation of the Proposed Development; and • All associated infrastructure, services and site works including excavation, earthworks, soil management, drainage and sediment control to facilitate the works. • A 10-year planning permission is being sought for the construction of the Proposed Development, alongside an operational period of 30 years. The underground cabling is intended to connect the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) to the proposed 110kV onsite substation at Lackendarragh North which is the subject of a separate application for consent to An Coimisiún Pleanála. This separate consent application includes the proposed onsite 110 kV substation at Lackendarragh North and associated works including 110 kV underground grid connection cabling between Lackendarragh North and the existing 110 kV Barrymore substation at Kill-Saint-Anne-North, Co. Cork. Coom Green Energy Park along with its grid connection was previously subject to EIA pursuant to planning ref. ACP Ref: 04.308885. The EIAR submitted with this application for consent assesses the entire project which includes all infrastructure associated with both applications for planning consent including the permitted Coom Green Energy Park. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.

The townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork

267m
26/1212Invalid - Case Closed8 May 2026

We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) and all associated ancillary works; • Forestry felling of 13 ha to facilitate construction and operation of the Proposed Development; and • All associated infrastructure, services and site works including excavation, earthworks, soil management, drainage and sediment control to facilitate the works. • A 10-year planning permission is being sought for the construction of the Proposed Development, alongside an operational period of 30 years. The underground cabling is intended to connect the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) to the proposed 110kV onsite substation at Lackendarragh North which is the subject of a separate application for consent to An Coimisiún Pleanála. This separate consent application includes the proposed onsite 110 kV substation at Lackendarragh North and associated works including 110 kV underground grid connection cabling between Lackendarragh North and the existing 110 kV Barrymore substation at Kill-Saint-Anne-North, Co. Cork. Coom Green Energy Park along with its grid connection was previously subject to EIA pursuant to planning ref. ACP Ref: 04.308885. The EIAR submitted with this application for consent assesses the entire project which includes all infrastructure associated with both applications for planning consent including the permitted Coom Green Energy Park. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.

The townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, County Cork

614m
22/4182WITHDRAWN1 Feb 2022

Construction of a dwelling house, install a secondary waste water treatment system and all associated site works

Leopardshill Knockaunalour Glenville Co.Cork

694m
16/6849CONDITIONAL15 Nov 2016

Construction of livestock underpass along with associated soiled water storage facilities and all associated site development works

Knockaunalour Glenville Co. Cork

727m
07/7103CONDITIONAL18 Apr 2007

Alterations and extension to dwelling

Mullenaboree Glenville

745m
08/7270CONDITIONAL13 Jun 2008

Dwellinghouse and installation of septic tank

Mullenaboree Glenville

765m
04/7844CONDITIONAL20 Oct 2004

Demolition of milking unit and construction of new milking unit to include milking parlour, dairy, pump room and collection yard.

Knockaunalour Glenville

765m
03/552CONDITIONAL13 Feb 2003

Cubicle shed, slurry tank and silage base

KNOCKAUNALOUR, KNOCKAUNALOUR,

781m
12/4119CONDITIONAL30 Jan 2012

(1) Demolition of existing feed silo, milking parlour and dairy (2) Partial demolition of existing calf house (3) Partial demolition of existing collection yard well (4) Construction of milking parlour and dairy with pump house and office attached (5) Construction of collection yard wall (6) Construction of a feed silo (7) Construction of an underground slatted tank in existing collection yard (8) Construction of extensions to south west of 2 no. existing calf houses (9) Construction of extension to south west of existing covered silage pit (10) Construction of extension to north west of existing slatted cattle house (11) Construction of a covered effluent tank to north of existing silage base (12) Construction of a dungstead to south of existing silage base (13) Carrying out of all associated site development works

Knockaunalour Glenville Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?