← Back to search

Lyttlewood, Mallow

INCOMPLETED APPLICATION

Planning application 04/3865

Cork - Cork County Council

Proposed Development

construction of an entrance to existing dwellinghouse

View the full application file on the council's planning portal →

Application Details

Location
Lyttlewood, Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
31 May 2004Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
04/7401CONDITIONAL30 Sept 2004

Construction of entrance to dwelling

Killetra Mallow

258m
22/6329CONDITIONAL17 Oct 2022

The change of use of existing convenience shop to include part off-licence use, gross floor area for off-licence use 9 sq.m, and associated works.

Navigation Road Firville West Mallow Co. Cork

264m
20/5863INCOMPLETED APPLICATION1 Sept 2020

Demolition of existing shop/workshop/store building, existing 3 no fuel tanks, triple chamber interceptor, septic tank and associated soakway, carwash enclosure building plus associated wash-pad/silt trap and all existing forecourt surfacing; (2) construction of a new single-storey forecourt building with 95.63sq.m retail shop, 6.77sq.m café/deli food prep area, 51.45sq.m café/deli sales & seating area, plus ancillary office, stores & toilet facilities: (3) refurbishment of existing fuel forecourt including provision of 3no. new fuel dispensers, provision of 3no. 40,000ltr underground fuel storage tanks and associated UPP flexible fuel pipework installation, (4) full refurbishment of existing forecourt canopy including new gutters, sheeting & flashings to the roof, new ceiling soffit sheeting with integrated light fittings; (5) sale of specially prepared hot & cold food items for consumption both on and off the premises from the café/deli food area of forecourt building: (6) ancillary signage for development, both illuminated and non-illuminated, (7) proposed car, motorcycle and bicycle parking and bin compound and (8) all associated site works including provision of waste water treatment plant with on-site raised filter bed area, full retention Class 1 oil interceptor, Class 1 bypass oil separator and grease trap. A Natura Impact Statement has been submitted with this application.

Racecourse Service Station Navigation Road Firville West Mallow, Co. Cork

264m
19/6558INCOMPLETED APPLICATION25 Oct 2019

(1) Demolition of existing shop/workshop/store building; (2) construction of a new single-storey forecourt building with 95.63sq.m retail shop, 6.77sq.m café/deli food prep area, 51.45sq.m café/deli sales & seating area, plus ancillary office, stores & toilet facilities: (3) refurbishment of existing fuel forecourt including provision of 3no. new fuel dispensers, provision of 3no. 40,000ltr underground fuel storage tanks and UPP flexible fuel pipework installation, (4) refurbishment of existing forecourt canopy including new gutters, sheeting & flashings to the roof, new ceiling soffit sheeting with integrated light fittings; (5) sale of specially prepared hot and cold food items for consumption both on and off the premises from the café/deli food area of forecourt building: (6) ancillary signage for development, both illuminated and non-illuminated, (7) proposed car, motorcycle and bicycle parking and bin compound and (8) all associated site works including provision of waste water treatment plant with on-site percolation area, full retention Class I oil interceptor, Class I bypass oil separator and grease trap.

Racecourse Service Station Navigation Road Firville West Mallow, Co. Cork

360m
19/4335INCOMPLETED APPLICATION13 Feb 2019

Construction of the following i.) two storey dwelling including single storey link to garage ii.) adjoined single storey garage iii) on site waste water treatment unit iv.) new vehicular entrance and all associated site works.

Firville East Mallow County Cork

360m
19/4574CONDITIONAL8 Mar 2019

Construction of the following i) two storey dwelling including single storey link to garage, ii) adjoining single storey garage, iii) on site waste water treatment unit, iv) new vehicular entrance and all associated site works.

Firville East Mallow Co. Cork

439m
14/6492CONDITIONAL21 Nov 2014

Construction of dwelling and associated services

Firville West Mallow Co.Cork

442m
06/7856CONDITIONAL7 Jun 2006

Dwellinghouse

Firville West Mallow

462m
09/4523CONDITIONAL20 Feb 2009

Demolition of existing dwelling and construction of dormer dwellinghouse, septic tank and percolation area

Firville East Mallow

462m
03/92CONDITIONAL14 Jan 2003

Demolition of existing dwelling & construction of dwellinghouse

FIRVILLE EAST, FIRVILLE EAST,

The submission window has closed

Observations on this application closed on Sunday 4 July 2004, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?