← Back to search

Lavally Lower Mallow

CONDITIONAL

Planning application 04/4710

Cork - Cork County Council

Proposed Development

Construction of bay window extension to dwelling and retention of garage and store

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Jun 2004

  2. Decision due

    22 Aug 2004

  3. Decision: CONDITIONAL

    23 Aug 2004

  4. Grant issued

    28 Sept 2004

Application Details

Location
Lavally Lower Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
28 June 2004
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 August 2004
Grant Date
28 September 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

79m
21/4649INCOMPLETED APPLICATION15 Mar 2021

Permission for retention of detached domestic garage and conversion of previously permitted attached car port to habitable accommodation, permission to construct a single storey extension to rear of existing dwelling and minor alterations to existing elevations and all ancillary site works.

Lavally Lower Mallow Co. Cork

79m
21/5091Conditional Permission28 Apr 2021

Retention of detached domestic garage, solar panels erected on flat roof of garage and conversion of previously permitted attached car port to habitable accommodation, permission to construct a single storey extension to rear of existing dwelling and minor alterations to existing elevations and all ancillary site works.

Lavally Lower Mallow Co. Cork

88m
08/4359INCOMPLETED APPLICATION25 Jan 2008

Dwelling, garage and installation of septic tank

Lavally Lower Mallow

88m
08/4937REFUSED22 Feb 2008

Dormer bungalow, garage and installation of septic tank

Lavally Lower Mallow

92m
16/6334CONDITIONAL21 Sept 2016

Construction of a split level storey and a half dwelling, detached garage, septic tank and percolation area and all associated site works.

Lavally Lower Mallow Co. Cork

104m
14/4520CONDITIONAL13 Mar 2014

Retention of ground floor extension to the south and conservatory to the west of dwelling, and Permission to construct a first floor extension to the south and alterations to the existing eastern elevation of dwelling.

Lavally Cottage Lavally Lower Mallow Co.Cork

115m
18/6734CONDITIONAL16 Oct 2018

Demolition of existing rear annexe and garage to side and construction of extensions to sides and rear of existing dwelling, alterations to existing front elevation including a new open porch and all ancillary site development works.

Montini Lavally Lower Mallow Co. Cork

116m
18/5892INCOMPLETED APPLICATION18 Jul 2018

To construct extensions to sides and rear of existing dwelling, alterations to existing front elevation including a new open porch and all ancillary site development works

Montini Lavally Lower Mallow Co. Cork

144m
22/4598CONDITIONAL16 Mar 2022

1) Construct a single storey extension onto their dwelling, (2) to make alterations to the existing dwelling, (3) to demolish the existing single storey extension at the rear of the dwelling and, (4) to partially demolish the existing domestic garage and all associated site works

Lavally Lower Mallow Co.Cork

177m
15/4894REFUSED30 Apr 2015

Construction , to rear of dwellinghouse, of a commercial shed to include auxiliary storage area, for the use only as mail order retail business for the sale of fishing tackle and fire arms for recreational use

Lavally Lower Mallow Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?