← Back to search

Kilboultragh Macroom

CONDITIONAL

Planning application 04/5693

Cork - Cork County Council

Application Timeline

  1. Application received

    23 Jul 2004

  2. Decision due

    9 Nov 2004

  3. Decision: CONDITIONAL

    9 Nov 2004

  4. Grant issued

    15 Dec 2004

Application Details

Location
Kilboultragh Macroom
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 July 2004
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 November 2004
Grant Date
15 December 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

184m
07/7540CONDITIONAL4 May 2007

Dwelling

Kilboultragh Clondrohid Macroom

231m
06/9137REFUSED21 Jul 2006

Dwellinghouse and garage

Kilboultragh Clondrohid Macroom

245m
08/7776CONDITIONAL9 Jul 2008

Dwelling, garage and septic tank

Kilboultragh Clondrohid Macroom

274m
07/4043CONDITIONAL3 Jan 2007

Dwellinghouse and garage

Kilboultragh Clondrohid Macroom

494m
07/6262INCOMPLETED APPLICATION21 Mar 2007

Construction of an easy feed, loose strawed/slatted house with calf & calving pens

Kilboultragh Clondrohid Macroom

494m
07/7573CONDITIONAL4 May 2007

Construction of easy feed loose straw/slatted house with calf and calving pens

Kilboultragh Clondrohid Macroom

516m
19/5410CONDITIONAL29 May 2019

Construct dwelling, detached garage and all ancillary site works

Ardnacrushy Clondrohid Co. Cork

560m
26/2649Awaiting Technical Validation14 Oct 2026

Permissin for: • Demolition of 13 no. existing disused intensive agricultural structures (former piggery) comprising sheds, silos, and tanks (with a combined gross floor area (GFA) of c. 2,256.3 sq.m), located within the northeastern section of the site and site clearance works. • Construction of 3 no. digesters (c. 15.5m in height), 1 no. digestate storage tank (c. 15.5m in height), located in the northeastern portion of the main site area. • 2 no. liquid feed tanks (c. 7.2m in height), a pump house (with a GFA of c. 14 sq.m and a height of c. 2.6m), and a pump skid (c. 0.8m in height) located adjacent to the digesters. • 3 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 6m in height) a pre fertiliser manufacturing tank (c. 6m in height), ferric chloride storage tank (c. 6m in height), and rain water storage tank (c. 6m in height), located to the west of the digesters, in the central portion of the site. • An O2 generation unit (with a GFA of c. 13.9 sq.m and a height of c. 2.6m), an O2 container (with a GFA of c. 13.9 sq.m and a height of c. 2.6m), an electrical container (with a GFA of c. 13.9 sq.m and a height of c. 2.6m), and a pump container (with a GFA of c. 16.9 sq.m and a height of c. 2.6m), located within the eastern section of the main site area, between the digesters. • A part single-storey and part two-storey reception hall (with a GFA of c. 1,964.4 sq.m and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, storage areas, and a liquid feed intake area, with an adjacent fire water storage tank (c. 7.7m in height) and well with water treatment equipment, located north of the reception hall, all located in the north-central portion of the site, to the west and northwest of the digesters. • A single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and an overall height of c. 12.4m, a fuel tank (c. 1.6m in height), a backup generator (c. 2.3m in height), located to the south of the reception hall, in the central portion of the site. • Odour abatement plant (c. 12m in height to stack) and equipment and a digestate offtake area to the south of the solid digestate storage and nutrient recovery building. • 2 no. biogas treatment skids (c. 4.1m in height), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 10m to top of flue), 2 no. biogas compression systems (c. 2.6m in height), a gas boiler (with a GFA of c. 13.1 sq.m and a height of c. 5.6m to top of flue), and a biogas upgrading module (with a GFA of c. 27.8 sq.m and a height of c. 4.6m), located in the southern portion of the main site area. • An emergency dual fuel flare (c. 11.3m in height) and 2 no. propane tanks (c. 1.3m in height), located to the west of the biogas treatment structures, within the southern portion of the main site area. • An ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m, a grid injection unit (with a GFA of c. 21.7 sq.m and a height of c. 2.8m), which will be connected to the gas grid via an underground connection by Gas Networks Ireland, within a fenced compound, and a grid offtake skid, located in the western portion of the main site area. • Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.7m and a GFA of c. 305.2 sq.m) located within the northwestern portion of the main site area. • Alterations to the L7451, the L7451 / Masseytown Road / L3417 junction, and the L3417, to the southwest of the main site area, to allow for improved access and safety, including the provision of a new site entrance, road widening, boundary setback, the trimming of overhanging tree branches and vegetation, and signage. • Construction of a site access road from the L7451 leading to the main site area, including a new entrance gate. • Provision of a discharge pipe route extending from the main anaerobic digestio

Kilboultragh, Macroom, Co. Cork

594m
04/5216CONDITIONAL7 Jul 2004

Walled silo

Kilboultragh Clondrohid Macroom

595m
06/6795CONDITIONAL2 May 2006

Slatted cow house

Kilboultragh Clondrohid Macroom

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?