Proposed Development
Extension to dwelling and retention of conservatory extension to dwelling
Application Timeline
Application received
26 Jul 2004
Decision: CONDITIONAL
16 Sept 2004
Decision due
19 Sept 2004
Grant issued
22 Oct 2004
Application Details
- Location
- Sparrograda Ballydehob
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 26 July 2004Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 September 2004
- Grant Date
- 22 October 2004
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of dwelinghouse
SPARROGRADA, SPARROGRADA,
Construction of detached stable and store building
Sparrograda, Ballydehob, Co. Cork
Construction of detached stable and store building
Sparrograda, Ballydehob, Co. Cork
Outbuilding consisting of stable, stable/tackroom and shed for storage
Sparrograda Ballydehob
2 no. dwellings
BAWNSHANACLOGH, BAWNSHANACLOGH,
Construction of a dwellinghouse, domestic garage, sewage treatment unit and associated site works
Derreennaclogh Ballydehob Co. Cork
Dwellinghouse, domestic garage, sewage treatment unit and associated site works
Derreennaclogh Ballydehob
Construct dwellinghouse, domestic garage, sewage treatment unit and associated site works
Derreennaclogh Ballydehob Co. Cork
A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existing on-site tracks and the construction of new on-site access roads. It will also include widening of two junctions along the turbine delivery route. The first is at the N71 - R592 junction in Knockroe townland, east of Ballydehob. These works will consist of the temporary removal of a section of masonry wall, public street lighting stanchion, gate, gate posts, trees and earthern berm and the raising of levels with engineered fill to that of the adjacent N71. The second is at the N71 - L8456 junction in Shronagree townland. These works will consist of the lowering of ground levels to that of the adjacent N71 and L8456 and the removal of traffic signage. Both locations to be restored following turbine delivery. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.
Shronagree, Ballybane East & Knockroe Townlands Ballydehob and Letterlicky Middle Bantry, Co. Cork
Dwellinghouse, installation of mini treatment plant system and associated site works
Derreennaclogh Ballydehob
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?