Application Details
- Location
- Dooneen Carrigtwohill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 September 2004Other applications received that week
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) Retain dormer development within originally permitted roof structure, (2) retain dormer extension to rear of originally permitted dwelling (3) permission to install domestic effluent treatment plant to replace existing septic tank together with all associated site development works.
Garranes Carrigtwohill Co. Cork
To erect a domestic garage attached to the side of their dwellinghouse. The garage will include a storage loft in the attic area.
Garranes Carrigtwohill Co. Cork
Construct a new dwelling house, new dual entrance, install a new wastewater treatment system and all associated site works.
Dooneen Carrigtohill Co. Cork
Dwellinghouse and garage
Dooneen Carrigtwohill
Construction of one-and-a-half storey dwelling, domestic garage and sewage treatment unit
Dooneen Carrgtwohill
Dwellinghouse and garage
Dooneen Carrigtohill
Construction of a 2-storey side extension to house including modifications/alterations to the elevations of the existing building and associated site works
Garranes Carrigtwohill Co. Cork
Retention of domestic garage
Garranes Carrigtwohill
(1) Demolition of existing dwelling (2) Construction of a new dwelling (3) Material change of use of external store to office and store with elevational changes and (4) Installation of septic tank and percolation area and all associated works.
Ballynakilla Carrigtwohill Co. Cork
To erect a dwelling house, a domestic garage, an on-site sewage treatment system, and all associated site development works at a site on the family land-holding
Garranes Carrigtwohill Co.Cork
The submission window has closed
Observations on this application closed on Monday 1 November 2004, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?