Bridgetown Castlemartyr

REFUSED

Planning application 04/77

Cork - Cork County Council

Proposed Development

Construction of 24 no. dwellinghouses and 6 no. Social/Affordable bungalows, provision of new amenity area and upgrading of existing amenity walks and pathways

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Jan 2004

  2. Decision: REFUSED

    5 Mar 2004

  3. Decision due

    7 Mar 2004

Application Details

Location
Bridgetown Castlemartyr
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
12 January 2004
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
5 March 2004

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

77m
09/8011CONDITIONAL21 Dec 2009

Construction of a 90-bed two-storey nursing home consisting of communal spaces, treatment rooms, dining rooms, kitchen, sanitary accommodation, staff facilities, administration areas & ancillary services including service road & yard, new gated vehicular & pedestrian access off Ladysbridge Road, 40 surface car parking spaces, foul sewer connection to local authority waste water treatment plant, surface water drainage including attenuation works, hard & soft landscaping & associated site development works.

Mitchell's Wood Bridgetown Castlemartyr

111m
22/6416CONDITIONAL26 Oct 2022

Upgrade the existing Castlemartyr Wastewater Treatment Plant at lands at Ladysbridge Road (R632), Castlemartyr, Co. Cork. The site is generally bounded by Castlemartyr Resort access road to the north, Castlemartyr Woods to the south, Ladysbridge Road to the east and Kiltha River to the west. The development will consist of the demolition of the existing: aeration tank; inlet works; forward feed pumping station; picket fence thickener; and site boundary post and wire fence. The development will also consist of works to upgrade the existing Castlemartyr WwTP including provision of: secondary / biological treatment facilities (including; 2 no. anoxic tanks (circa 115 cubic metres), 3 no. aeration tanks (circa 342 cubic metres); 2 no. 8 metre diameter settlement tanks); a forward feed pumping station (circa 19 cubic metres); above-ground storm-tank with circa 255 cubic metres of storage; tertiary treatment for phosphorus removal (comprising chemical dosing and filtration including 1 no. disc filter); a sludge management system (including the re-purpose of the existing clarifier tank to new picket fence thickener); an emergency stormwater overflow chamber; provision of circa 32 metres of below ground inlet sewer; circa 15 metres of below ground outfall pipeline ( to discharge flows to the existing outfall location at the Killtha River); a surface water drainage interceptor; a treated effluent outfall headwall to the Killtha River (discharging to existing outfall location); and the upgrade of the existing inlet works including 2 no. fine screens and grit removal facility. The works will also consist of: provision of a new control building (circa 79 square metres); an ESB sub-station (circa 22 square metres); a permanent back-up generator and associated fuel tank; access gates and boundary fencing; all hard and soft landscaping; manholes; and all other associated site excavation, infrastructural and site development works above and below ground. A Natura Impact Statement has been prepared in respect to the proposed development and will be submitted with the planning application.

Castlemartyr Wastewater Treatment Plant Ladysbridge Road, Bridgetown Castlemartyr Co.Cork

181m
04/671CONDITIONAL6 Feb 2004

Residential development of 10 no. dwellings, associated car-parking and site development works with access from new entrance and access road from Ladysbridge

Bridgetown Castlemartyr

267m
25/5370Conditional Permission9 Jul 2025

1) New part single storey, part two storey detached dwelling, 2) Single storey link from the main dwelling to; 3) Single storey home office and commercial Beauty Salon with 2 no. treatment rooms, 4) Detached single storey domestic garage, 5) New wastewater treatment unit and all associated site works.

Gortnahomna More Castlemartyr Co Cork

267m
25/4650INCOMPLETED APPLICATION10 Apr 2025

Permission for construction of the following: 1) A part single storey, part two storey detached dwelling ; 2) A single storey link from the main dwelling to ; 3) A single storey home office and beauty salon with 2 no treatment rooms; 4) A detached single storey garage; 5) And all associated site works.

Ladysbridge Road Castlemarty Co. Cork

267m
17/6087CONDITIONAL11 Aug 2017

Construction of 3 no. dwellings and associated site works

Gortnahomna More Castlemartyr Co. Cork

273m
16/6566CONDITIONAL17 Oct 2016

The development will consist of a safety enhancement to the existing gas mains network comprising a District Regulator Installation (DRI) made up of a pressure Relief Unit (Cabinet c. 1.62m) and associated vent stack (up to approx. 3.5m in height) as well as site development works.

Site at boundary of open space to east of No. 20 Bridgecourt Gortnahomna More Castlemartyr

288m
14/6178CONDITIONAL9 Oct 2014

Construction of new dressing room self contained building unit consisting of 2 no. dressing rooms with integrated showers & toilet facilities, referee’s changing room & boiler house

Bridgetown Castlemartyr Co.Cork

288m
14/6039INCOMPLETED APPLICATION23 Sept 2014

Construction of new dressing room self-contained building unit consisting of 2no. new dressing rooms with integrated showers & toilet facilities, referee’s changing room & boiler house

Bridgefield Castlemartyr Co.Cork

288m
10/8086INCOMPLETED APPLICATION30 Sept 2010

Installation of indoor practice court/ball alley, provision of new pedestrian wicket gate onto main road and extension to existing main vehicular entrance/exit onto main road

Bridgetown Castlemartyr Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?